Subway Hoarding Brief Introduction:
The construction site around subway hoarding should be enclosed with continuous and sealed fences as required. For multi-story or high-rise buildings, safety protection facilities should also be installed. Fences set on major urban road sections, scenic roads, and squares at airports, ports, and stations must not be lower than 2.5 meters in height. Fences on other road sections should not be lower than 1.8 meters in height.
Hebei subway hoarding
2. Materials used for hoarding should ensure stability, cleanliness, and aesthetics. For municipal engineering project sites, hoarding can be set up in sections according to the progress of the project or uniform continuous railing facilities can be used as per regulations. Construction units are prohibited from stacking construction materials, waste, and construction debris outside the site hoarding. In areas temporarily occupied with approval, materials or machinery and equipment should be stored or unloaded strictly within the approved land area and usage nature. The perimeter of the temporary area should be enclosed with a fence higher than 1 meter.
3. At conditionally approved construction sites, prominently display or write catchy promotional slogans reflecting the spirit of the enterprise and the era on the perimeter walls, dormitory exterior walls, and similar areas.