How to ensure civilized construction in the construction of central oxygen supply projects?
Develop quality and safety management regulations for the central oxygen supply construction site, conduct quality and safety briefings, clarify corresponding reward and punishment measures, and develop civilized construction technical measures:
(1) Measures to ensure the safety of construction machinery and equipment
The supply of construction materials and equipment is another important link in ensuring the smooth progress of the project. The quality of material management has a direct impact on engineering quality and cost. To this end, the following measures must be taken:
a、 Send materials in batches according to the construction progress of the hospital's oxygen supply system.
b、 Carry out material testing, alternation, and acceptance work.
c、 Carry out the unpacking, inspection, and acceptance of the equipment supplied by Party A.
d、 Strengthen the storage of incoming materials and strictly implement the material requisition system.
(2) Measures to ensure the provision of construction equipment and tools
a、 Coordinate the entry of equipment in stages according to the schedule, ensuring that construction needs are met without leaving it idle.
b、 All incoming equipment must be repaired and maintained in advance to ensure that they are in good condition.
(3) Coordinate and ensure measures
a、 Internal relationship coordination
Coordinate internal supply and demand relationships by the project manager. Resources such as labor, materials, mechanical equipment, power, etc. are ensured to ensure the optimal utilization of the project, and construction is carried out in an orderly manner according to the construction schedule.
b、 External coordination
Focus on coordinating with the design department and the general contractor. Take an active attitude to coordinate on an equal basis.
c、 Construction preparation for central oxygen supply project
(1) Technicians, quality inspectors, and construction personnel should carefully familiarize themselves with the drawings and relevant specifications, standards, and design requirements.
(2) Develop practical and feasible construction plans, quality assurance measures, and safety technical measures.
(3) Technical personnel should provide technical briefing to relevant personnel participating in the construction.
(4) The pipeline components and pipeline supports shall be purchased uniformly by the company, inspected by the company's quality inspection department, and those who pass the inspection shall possess relevant technical certificates.
(5) Set up temporary buildings to provide accommodation for employees, canteens and other facilities, warehouses, etc. The above is the suggestion from the central oxygen supply manufacturer on how to ensure civilized construction during the construction of the central oxygen supply project.