New Type Suspended Scaffold_SupplyPro Co., Ltd._Handan Xiongbao Fastener Manufacturing Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
13292070980

New Type Suspended Scaffold

产品Price Negotiable

最小起订Quantity: 供货总Quantity:

用手机扫描二维码直达商品手机版
MobileView details
Location:
Hebei/Handan
有效期至:
长期有效
最后更新:
2024-11-06 11:06
Product Details

Available locations

Custom Processing

Is

Origin

Hebei

1. The new external suspension system requires no wall penetration installation, thus avoiding damage to the concrete beam and slab structure, and preventing water seepage and leakage.

2. W-beam material consumption reduced; average usage is 1.5 meters, lowering procurement costs.

3. All materials except for plastic pre-buried components are reusable.

Usage Instructions:

After the floor concrete pouring is completed, wait for 18 hours after the floor concrete pouring (adjustable according to the temperature), install the I-beam with steel plate on one side at the pre-buried pipe location of the floor, pass M20#10.9 grade high-strength bolts through the holes in the I-beam steel plate and the pre-buried steel sleeve, add an 80mm×80mm×8mm steel plate on the back with flat washers, spring washers, and tighten the nuts.

On the upper level of the cantilevered layer, at the corresponding positions of the outer wall, outer beam, and I-beam, pre-bury a steel sleeve (the same as the pre-buried method for I-beam sleeve). After the concrete pour for the upper level is completed, begin installing the steel tie rod, which is divided into two sections. One with a rectangular steel plate is installed on the upper level's edge beam, and one with a rounded steel plate is installed on the I-beam hanger plate. All connection points are connected with M20#10.9 grade high-strength bolts; then, tighten the turnbuckle bolts to form a triangular load-bearing system.

How to use the new suspended scaffold?

1. Determine the placement of plastic embedded parts and installation bolts.

2. Remove the installation bolts and O-rings after demolding, and install double-end high-tensile bolts.

3. I-beams are positioned and secured with nuts.

4. Erect steel pipe scaffolding.

5. Same method for pre埋 installation of bolts when forming upper beam and plate.

6. After demolding, assemble the telescopic handle and adjust to the proper length before securing with a pin.

What services can be provided by purchasing the new suspended platform?

1. A professional team offers you free technical guidance

2. Multiple professional exterior frame engineers provide free technical guidance throughout the process.

3. Available for steel layout drawings and calculation books

4. On-site installation guidance by professional technical personnel


询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
13292070980

Back to Top