Fastener Manufacturing
产品Price Negotiable
最小起订Quantity: 供货总Quantity:
Available Markets |
|
Custom Processing |
Is |
Origin |
Hebei |
1. The new type of external suspension does not require wall installation, thus preventing damage to the concrete beam and slab structure, and ensuring no leakage. 2. W-beam material consumption reduced; average usage of 1.5 meters to lower procurement costs. 3. Materials, excluding plastic precast components, are reusable. Usage Instructions: After the floor concrete pouring is completed, wait for 18 hours (adjustable based on temperature) after the floor concrete pouring. Install the I-beam with steel plate on one side at the pre-buried sleeve location of the floor, insert M20# 10.9 grade high-strength bolts through the holes in the I-beam steel plate and the pre-buried steel sleeve, add a 80mm×80mm×8mm steel plate on the back, along with flat washers, spring washers, and nuts, then tighten them. On the upper layer of the cantilevered floor, at the corresponding positions of the outer wall, outer beam, and I-beam, pre-bury a steel sleeve (the same as the I-beam sleeve). After the concrete pour for the upper layer is completed, begin to install the steel tie rod, which is divided into two sections. One with a rectangular steel plate is installed on the upper floor edge beam, and one with a round head steel plate is installed on the I-beam hanger plate. All connection points are connected with M20#10.9 grade high-strength bolts; then, tighten the turnbuckle bolts to form a triangular force system. How to use the new type of cantilever scaffold? 1. Determine the placement of plastic embeds and installation bolts. 2. Remove the installation bolts and O-rings after demolding and install double-head high-tensile bolts. 3. Place the I-beam in position and secure it with nuts. 4. Erect steel pipe scaffolding. 5. The same method is used for pre-burying and installing bolts when formwork is supported for upper beam slabs. 6. After demolding, assemble the handlebars and adjust to the appropriate length, then secure with a pivot pin. What services can be provided by purchasing the new cantilever scaffold? 1. A professional team offers you free technical guidance 2. Multiple professional external frame engineers provide free technical guidance throughout the process 3. Available steel profile layout and calculation sheets 4. On-site installation guidance by professional technical personnel


Phone Consultation