Steel column base grouting material installation_SupplyPro Co., Ltd._Guangdong Shijia Gaojian Building Materials Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Guangdong Shijia Gaojian Building Materials Technology Co., Ltd.

High-strength non-shrink grouting material, high-strength polymer mortar, bea...

Consultation Hotline
13829788227

News Center Co., Ltd.

Product Categories
Home > SupplyPro Co., Ltd. > Steel column base grouting material installation
Steel column base grouting material installation
品牌: Shi Jia Construction
Product Features:
Material: Cement Grouting Material
Origin: Guangdong
单价: 990.00/ton
最小起订Quantity: 1 ton
供货总Quantity: 10000 ton
有效期至: 长期有效
最后更新: 2022-12-26 15:55
 
详细Info

Guangzhou High-Strength Grouting Equipment, Grouting Material Manufacturer; Shenzhen Non-Shrink Anchor Grouting Material Manufacturer; Zhuhai Self-Compacting Structural Reinforcement Grouting Material Manufacturer; Main Products:CGM High-Strength Non-Shrink Grouting Series, CGM-340, CGM-380, Epoxy Grouting, Epoxy Patching Mortar, CGM-320 Support Grouting, Rapid-Fill Gravity Mortar, Seat Mortar, CGM High-Strength Emergency Repair Material; High-Strength Polymer Mortar, Epoxy Support Grouting, Polymer Crack-Resistant Mortar, Polymer Waterproof Mortar, Rapid Repair Material for Cement Pavements, Track Mastic, Concrete Carbonation-Resistant Coating, Bonding Agent, Prestressed Pipe Grouting Agent, Abrasion-Resistant Floor Hardener, etc., as well as masterbatch products...

CGM High-Strength Non-Shrink Grouting Material

Product Features1. Early strength, with compressive strength of ≥27 MPa after 1 day; ≥40 MPa after 3 days; and ≥60 MPa after 28 days.

2. Microexpansivity

Ensure tight contact between the equipment and foundation, with no shrinkage after secondary grouting.

3. High fluidity

Fills all voids, meets the requirements for secondary grouting of equipment.

4. Anti-segregation

Overcame the phenomenon of segregation caused by excessive water addition during on-site use.

5. Crack-resistant

Cracking phenomena during on-site use due to uncertain water addition, ambient temperature, and limitations on maintenance conditions.

6. Durable

After millions of fatigue testsNo significant change in strength after 50 freeze-thaw cycles. Strength increased notably after soaking in engine oil for 30 days.

7. Suitable for winter construction

Permitted toOutdoor construction at -10℃ temperatures.

Product Application:

Used for secondary grouting of equipment foundations.

2. For anchoring foot bolts and reinforcing bar embedding.

3. For reinforcement and repair of concrete structures.

Technical Specifications:

Pre-construction preparations

1. Machine Mixing: Concrete mixer or mortar mixer;

2. Manual Stirring: Several mixing basins and shovels

3. Several buckets.

4. Several weighing scales

5. Flow Channels

6. High-position funnels, grouting pipes, and pipe joints

7. Grouting Propeller

8. Templates (steel molds, wooden molds)

9. Burlap bags, rock wool blankets, etc.

10. Cotton yarn, tape;

Grouting construction

Step 1: Basic Processing

The base surface should be roughened. Clean the base surface, ensuring there are no debris, float, loose dust, oil stains, and release agents, etc. Prior to grouting.24 hours, the base surface should be fully moistened; before grouting, remove any standing water 1 hour prior.

Two Steps: Feel and Touch

1. Set up forms according to the grouting construction drawing. Seal the joints between the forms and the foundation, as well as between the forms themselves, using cement grout and tape to ensure the entire form system is waterproof.

2. The horizontal distance around the template and base should be maintained at approximately 100mm to facilitate grouting work.

3. The template's top elevation should be 50mm higher than the surface of the equipment base.

4. In case of leakage during grouting, it should be addressed promptly.

Step 3: Grout Mixture Preparation

Generally, water is mixed according to a standard of 13-14% for general reinforced type, and 9-10% for aggregate reinforced type.

2. Mechanical stirring is used, with a general mixing time of 1-2 minutes (using a drill mixer is strictly prohibited). When mixing manually, first add 2/3 of the water and mix for 2 minutes, then add the remaining water and mix until uniform.

3. The mixing amount should be determined based on the usage quantity to ensure the material is used up within 40 minutes.

4. It is strictly prohibited to add any admixtures or external additives to CGM grouting material during on-site use.

Step 4: Grouting Construction Method

1. For longer equipment or track foundations, segmented construction should be employed.

2. Diagrams of several commonly used grouting methods

3. During the secondary grouting, the following requirements should be met.

1.1 During secondary grouting, it should be performed from multiple points on one side or adjacent sides until it overflows from the opposite side, to facilitate air venting during the grouting process. Grouting from all four sides simultaneously is not permitted.

1.2 Once the grouting begins, it must be conducted continuously without interruption and the grouting time should be minimized as much as possible.

1.3 It is strictly prohibited to vibrate during the grouting process. If necessary, use a grouting booster to push the CGM grouting material along the bottom of the grouting layer, but严禁 pushing from the middle or upper part of the grouting layer to ensure the homogeneity of the grouting layer.

After the equipment foundation grouting is completed, a 45-degree bevel should be cut along the equipment edge within 3-6 hours after grouting (refer to the illustration below) to prevent cracks from forming at the ends. If edge cutting is not possible, the grouting layer surface should be smoothed with a trowel within 3-6 hours after grouting.

When the thickness of the grouting layer exceeds 150mm, use reinforced stone aggregate high-strength shrinkage-free grouting material.

1.6 When the base grouting volume of the equipment is large, mechanical mixing should be used for the gravel reinforcement grouting material to ensure the grouting construction.

Step 5: Maintenance

1. Immediately cover with a wet straw blanket or rock wool blanket within 30 minutes after grouting, and maintain its moisture.

2. During winter construction, the maintenance measures should also comply with the relevant provisions of the current (GB50204).

3. After the grouting material reaches the demolding time, the equipment installation can be carried out. Please refer to the "Demolding and Curing Time vs. Environmental Temperature Chart" for the specific time.

4. After the equipment foundation grouting is complete, if any part needs to be removed, gently scrape it off with a spatula or shovel tool within 3-6 hours after grouting, before the grout hardens.

5. Do not transmit vibration from operating machinery to the equipment foundation. After secondary grouting, the machine should be shut down for 24-36 hours to prevent damage to the unhardened grouting layer.

Packaging and Storage

Packaging specification: 50kg/bag, store in a well-ventilated and dry place, and prevent direct sunlight.

Guangxi: Liuzhou Nanning Qinzhou Visitors Guangxiang Port Chongzuo Yulin Guilin Wuzhou Baise Hezhou Beihai Hechi Fangcheng Port

Guangdong: Shenzhen Guangzhou Shaoguan Jiangmen Yunfu Yangjiang Zhuhai Qingyuan Maoming Shantou Foshan Zhongshan Huizhou Meizhou Dongguan Zhaoqing Zhanjiang Heyuan Shantou Chaozhou Jieyang

询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

13829788227