Manual Winch - Ruisen Hydropower Machinery - Factory Direct, Competitive Pricing, Installation and Commissioning Guaranteed_SupplyPro Co., Ltd._Xinhe Ruixin Hydraulic Machinery Factory 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Xinhe Ruixin Hydraulic Machinery Factory

Gate operators, gates, winches, silt screens, cleaning machines, rubber water...

15803293787

Manual Winch - Ruisen Hydropower Machinery - Factory Direct, Competitive Pricing, Installation and Commissioning Guaranteed

产品Price Negotiable

最小起订Quantity:1 Vehicle 供货总Quantity: 999 Vehicle

用手机扫描二维码直达商品手机版
MobileView details
Location:
Hebei/Xingtai
有效期至:
长期有效
最后更新:
2022-12-06 18:03
Product Details

Once the winch equipment is ready, it is necessary to inspect and adjust it.

Open Gear Drive CM02, with a tooth side clearance of 0.42mm, the contact area along the tooth height is not less than 40%, and the extension length is not less than 50%.

2. Inspect the operation of the braking system's drive mechanisms for smoothness and reliability, and adjust the release to ensure the clearance between the brake shoe and the brake wheel is no more than 0.7-0.8mm.

3. Inspect that all transmission systems of the safety brake are smooth and secure, and adjust the slack so that the clearance between the brake shoe and the brake wheel is no more than 1.5mm when releasing the brake.

4. Verify that the control electrical equipment for the operating and safety brakes is interlocked with the main motor. Suggest that the main motor's operating brake be released, and the operating brake on the auxiliary motor is engaged. Additionally, adjust the main motor only when the safety brake is released.

Smooth winch

1. Select winter gear oil or full cylinder oil for the reducer to ensure smooth operation, with the oil level ensuring that the worm shaft is fully immersed in the oil. Change the oil for the reducer annually.

2. The main shaft bearing and the output shaft end of the reducer should be timely replaced or supplemented with No. 4 calcium-based grease, changing the oil every two years.

3. Prior to each drive, lubricate the open gears with smooth oil.

4. All other smooth surfaces should be lubricated before each operation, particularly the thrust rings between the two gears on the reducer output shaft and the bushes for the movable gears should be lubricated with grease.

Winch trial operation

Winch equipment, upon completion, should be inspected and adjusted, confirmed to be free of errors, then lubricate the smooth parts. Perform a no-load test operation, followed by a load test after wrapping. Gradually increase the load to the rated capacity. Under standard voltage, the current does not exceed the rated value, and there is no heat generation in the motor, reducer, and other components.


询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
15803293787

QQ Service

QQ Service:
2213720843

Back to Top