详情描述

Installation Instructions:

① Perform rubber filling on the damaged areas requiring repair (refer to the filling section in the tape joint vulcanization process, or have our service personnel demonstrate during equipment debugging).

② Place the lower shelf beneath the repair area (evenly), on the shelf, position the water pressure plate below the tape, and the lower heating plate (directly above the repair area).

③ Place a heating plate, an insulating board, and then the upper machine frame directly below the repair area, aligning it with the lower machine frame.

④ Install the handle, washer, and nut, then tighten securely.

⑤ Connect the control box to the power source with a single wire, and connect the heating plate to the control box with a separate wire. Ensure the connections match the labels on the control box.

⑥ Connect the pump to the pressure plate with a high-pressure hose, turn on the electric control box, and fill the pressure plate with water to the硫化 pressure.


询价单

主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》