详情描述

Installation Instructions:

① Conduct rubber filling treatment for damaged areas requiring repair (refer to the filling section in the vulcanization process of tape joints, or have the factory service personnel demonstrate during equipment debugging).

② Place the lower shelf beneath the repair area (evenly), on the shelf, position the water pressure plate below the tape, and the lower heating plate (directly above the repair area).

③ Place a heating plate, an insulating plate, and then the upper frame directly below the repaired area, aligning it with the lower frame.

④ Install the handle, washer, and nut, then tighten securely.

⑤ Connect the control box to the power source with one set of wires and the heating plate to the control box with another set. Ensure the connections match the labels on the control box.

⑥ Connect the pump to the water pressure plate with a high-pressure hose, turn on the electric control box, and fill the water pressure plate with water to the vulcanization pressure.


询价单

主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》