Erdao City Longwan Building 4, 9th Floor Column Shear Wall Reinforcement Replacement Project_News Center Co., Ltd._Guangzhou Shengte Construction Technology Development Co., Ltd._Zhongshang 114 Industry Resources Network 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Guangzhou Shengte Construction Technology Development Co., Ltd.

Building Reinforcement, House Alignment Correction, Found...

24-hour Service Hotline
13925185076
Current Location:Home>News Center Co., Ltd.>Erdao City Longwan Building 4, 9th Floor Column Shear Wall Reinforcement Replacement Project

    Erdao City Longwan Building 4, 9th Floor Column Shear Wall Reinforcement Replacement Project

    2023-08-12

    This project is located in Ordos City, Inner Mongolia, China.1Floor, above ground22The building features a concrete shear wall structure. Upon completion and before the decoration phase, the building was inspected and found to be...9Layered shear walls, columns, and10The concrete strength grade for the layer beam deck is12.8MPa15.3MPaNot meeting, and far below, the original design specifications.C25Concrete strength grade standards. Thus, it is necessary to9Layer after layer of shear walls, columns, and10Overall replacement treatment for the floor joists and beams, with a total replacement area of877Our company has recently achieved a significant milestone in our industry.2012Year7Month of construction entry10Completion by end of the month100The concrete replacement and reinforcement project is quite rare nationwide due to the significant upper load it bears.


     

    Project Features:

    1.Due to9High-level loads are heavier.9Layered shear walls, columns, and10The concrete strength of the floor joists is relatively low, making the support work during the replacement process quite challenging.

    2.Our company has developed a patent technology known as "A Steel Tray Support Force Transmission System," which effectively addresses the replacement method for upper large loads.

    3.The effective application of static blasting technology facilitates the replacement work more quickly.

    4.The application of electronic monitoring technology enables the replacement project to be executed through information-based construction, making it safer and more reliable.

     

    Key Technology:

    Steel pallet technology

    Primary and Secondary Support

    Stress Relief

    Static demolition

     




Contact us

Guangzhou Shengte Construction Technology Development Co., Ltd.
Service Hotline 13925185076
Company Phone 13925185076
Company Address 11 Xijiu Street, Xijiu Road, Jinshazhou District, Baiyun District, Guangzhou, Guangdong Province

Message Consultation

 Click OK to indicate that you agree to《Service terms》《Privacy policy》

b2b.china9.net © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930

 Click OK to indicate that you agree to《Service terms》《Privacy policy》