The construction of Luhui stone wall is a highly complex process, with each step requiring strict quality control. The renovation process is time-consuming, and wall stone adhesive work is a technical construction project. With complete auxiliary materials and well-prepared substrates, each worker can complete approximately 5 square meters per day. Generally, it takes about 7 days to lay and adhere wall tiles in a typical family bathroom and kitchen. Different specifications of ceramic wall tiles, different types of adhesive used, and varying numbers of pipes on the substrates all affect the construction timeline. Therefore, the actual timeline should be determined based on the on-site conditions. The adhesive work for wall tiles can be carried out simultaneously or concurrently with other projects, but care must be taken to protect the finished products.
The sequence of wall stone adhesive work: Wall tile adhesive work is one of the main technical tasks performed by bricklayers in home renovation projects. The standardized adhesive sequence for wall tiles is: preliminary cleaning and treatment → applying base coat → selecting tiles → soaking → laying out tiles → marking lines → adhering to standard points → adhering tiles → grouting → cleaning joints → final cleaning; This directly affects the renovation effect and the quality of wall tile adhesive work. Particularly for deep-colored tiles, the quality of adhesive work becomes even more prominent in the evaluation of home renovation quality. It is essential to strictly follow the standardized procedures to ensure quality.
2. Construction Standards for Wall Stone Adhesive Application All types of dirt on the wall should be thoroughly cleaned, and the base should be treated, with water applied to moisten it a day in advance; if the base is a new wall, brick laying, granite alignment, and tile adhesive should be carried out when the cement mortar is 70% dry; to control the flatness of the adhesive surface, a standard point must be粘贴 before the formal adhesive process. During operation, the flatness should be checked with a level at all times, and any uneven or crooked tiles should be removed and re-adhered; the standard is that no bubbles should appear on the bricks.
Before stone adhesive application, stones must be soaked in clean water for over two hours. Remove and let them dry for use; apply adhesive from bottom to top, ensuring the mortar is full. In case of insufficient mortar, remove and reapply; do not stuff mortar into gaps or edges. During renovation, always pay close attention to every detail and take full responsibility for the construction of your home.
b2b.china9.net © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930