The Qingpei Xunhong Suction Drainage System can be divided into the following processes:
Customer-provided materials
Customers provide floor and elevation plans for multi-story buildings.
Divide Water Diversion Areas
Divide the roof surface into various drainage zones based on water runoff patterns, and calculate the runoff area for each zone.
3 Determine the Recurrence Interval of Heavy Rainfall
In accordance with the requirements of the property owner and the design institute, the recurrence period of heavy rain has been determined.
Positioning Rain Gutter Arrangement
Based on the total rainfall volume and the length of the building's gutter, determine the model, quantity, and distribution of siphon rainwater heads, as well as calculate the system pipe diameter.
Through professional siphon drainage design software, pipe diameters are calculated and siphon rainwater drainage system diagrams are drawn.
6 Computational Engineering Materials
Based on the completed floor plan and rainwater system diagram, the engineering materials have been calculated. 7. Audited for accuracy and submitted to the client.
After review by our company's auditors, confirmed accurate, delivered to the client.
Contact us

Service Hotline
13584000056

Company Telephone
13584000056

Address
1 Mu Fu East Road, Greenfield Plaza, Building 8, 905, Gulou District, Nanjing City
b2b.china9.net © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930