1. The autoclaves should be placed indoors. When multiple autoclaves are equipped, they should be placed separately. Each operation room should have an exit leading directly to the outdoors or a corridor, and the equipment location should be well-ventilated.
When installing the pot lid, prevent the sealing surfaces of the pot body and lid from knocking against each other. Carefully place the lid in the fixed position on the pot body, and when tightening the main nut, do so diagonally and symmetrically in multiple steps. Apply even force; do not allow the lid to tilt to one side for a good seal.
3. At the connection of the male and female nuts, only rotate the nuts in opposite directions; the two circular sealing surfaces must not rotate towards each other. When assembling all threaded nut components, apply lubricating oil.
4. The needle valve series line is sealed with a simple turn of the valve pin, tightly closing the sealing surface for a secure seal.
5. Rotate the revolving part on the pot by hand to check for smooth operation.
Controllers should be placed flat on the operating surface, with an operating environment temperature of 10-40°C, relative humidity below 85%, and free from conductive dust and corrosive gases in the surrounding medium.
7. Inspect the moving parts and fixed connections on the front and back panels for proper operation. Remove the top cover to check for loose connections on the plug-in modules, and look for any damage or corrosion caused by improper transportation or storage.
Controllers should be reliably grounded.
Connect all wires, including power lines, electric furnace lines between the controller and the kettle, motor lines, and temperature sensor and speed sensor wires.
Turn on the main power switch on the panel, and the digital display should show.
11. Set various parameters (such as upper alarm temperature, working temperature, etc.) on the digital indicator, then press the "Heat" switch. The electric furnace will be powered on, and the indicator light on the "Heat" switch will illuminate. Adjust the "Voltage Control" knob to regulate the heating power of the electric furnace.
Step on the "Stir" switch, the stir motor will be powered on, and the indicator light on the "Stir" switch will illuminate. Gradually turn the "Speed Control" knob to slowly rotate the motor. Observe if the motor is rotating clockwise. If there are no issues, shut off the motor, attach the belt, and restart.
After operation, the unit can be naturally cooled, water-cooled, or air-cooled by placing it on a stand. Once the temperature has dropped, release the pressurized gas inside the kettle to reduce the pressure to atmospheric (pressure gauge reads zero), then evenly loosen the main nut symmetrically, remove the main nut, and carefully lift the kettle lid, placing it on the stand.
14. After each operation, there should be no residue left on the kettle body and cover. The main sealing port should be cleaned regularly and kept clean; it is not permitted to use hard or rough objects for wiping.
Contact us

Service Hotline
18853717521

Company Telephone
18853717521

Address
Shandong Province, Jining City, Liupu Town, Luli Jing Village, Liangshan County
b2b.china9.net © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930