Huai Nan Boiler Chimney Demolition Construction/Diverse Demolition Plans - Huai Nan High-altitude Demolition Company_SupplyPro Co., Ltd._Jiangsu Huadian High-altitude Engineering Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Jiangsu Huadian High-altitude Engineering Co., Ltd.

Chimney Corrosion Prevention & Aesthetics, Chimney Demoli...

Consultation Hotline
15380592966

News Center Co., Ltd.

Product Categories
Home > SupplyPro Co., Ltd. > Huai Nan Boiler Chimney Demolition Construction/Diverse Demolition Plans - Huai Nan High-altitude Demolition Company
Huai Nan Boiler Chimney Demolition Construction/Diverse Demolition Plans - Huai Nan High-altitude Demolition Company
品牌: Huadian High-Voltage
Brand: Huadian High-Voltage
Construction Method: High-altitude operations
Demolition object: Chimney
单价: 1000.00/Rice
最小起订Quantity: 100 Rice
供货总Quantity: 240 Rice
有效期至: 长期有效
最后更新: 2022-12-16 08:44
 
详细Info


Huai Nan Boiler Chimney Demolition Construction/Diverse Demolition Plans - Huai Nan High-altitude Demolition Company

Jiangsu Huadian High-Voltage Engineering Co., Ltd.'s chimney demolition services require only a fraction of the costs for other types of demolition, and no special permits are needed, making it highly promotable. Manual demolition demands a high quality of both equipment and personnel. To ensure safety and construction quality, mechanical equipment should be repaired and maintained before the project starts, and personnel should receive comprehensive training and technical briefings.

Safety requests for the removal of Huai Nan boiler chimneys
1. A designated person should be in charge of the construction site with a chimney removal, and a technical supervisor should be on-site.
2. Chimney demolition should be strictly conducted according to the methods and procedures determined by the construction plan or organizational design. Generally, it should be carried out from top to bottom in a symmetrical sequence, without removing multiple layers simultaneously. If the demolition of some buildings may affect the stability of others, pre-emptive reinforcement measures should be taken to prevent sudden collapse.
3. When chimney demolition workers are performing removal operations, they should stand on the erected scaffolding or other structural components, not on the components being dismantled. Operators must wear a hard hat, gloves, safety shoes, and other personal protective equipment. For high-altitude work, a safety belt must be fastened. To prevent debris and dust from entering the eyes, protective eyewear should be worn.
4. Removed materials must not be carelessly stacked on the floor. It is strictly prohibited to collapse walls onto the floor, as this may cause the floor to collapse and lead to accidents. Removed materials must not be thrown downwards; they should be dropped to the ground floor through the debris drop-off point or slid down and then sorted and removed. Larger components should be dismantled using a crane and then broken. When the crane is lifting, it should be confirmed that the connected steel bars or embedded parts have been cut and separated to avoid overloading and damaging the crane equipment.

Huai Nan Boiler Chimney Demolition Construction/Diverse Demolition Plans - Huai Nan High Altitude Demolition Company

5. When dismantling materials are stacked on the ground, they should be orderly arranged according to the construction site layout plan and promptly removed. Materials should not be stacked close to the perimeter wall, nor should dismantled components be placed on the wall, to prevent the wall from being crushed and causing a disturbance.
6. Demolition typically does not involve toppling the entire structure. If necessary, the following rules must be adhered to: the depth of cutting into the wall base should not exceed one-third of the wall thickness. If the wall thickness is less than two and a half bricks, excavation is prohibited. To prevent the wall from collapsing towards the excavation direction, support it securely before excavation. A signal should be given before the structure is toppled; only proceed when all personnel are at least twice the height of the structure away, with a clear distance.
7. When mechanical demolition is in progress, a dedicated commander should be appointed to monitor the structural intentions of the items being demolished and promptly direct the machinery operator's movements via walkie-talkies. The impact points and processes should be executed according to the previously determined plan.
When using mechanical demolition, select the appropriate demolition equipment based on the height of the building to be demolished, and do not exceed the machine's working height. After the day's demolition work is completed, the equipment should be removed to a safe distance outside the demolished building.
8. Demolition construction is significantly affected by natural climate and environmental factors, and close attention should be paid at all times. At the end of each workday or during a noon break, engineering personnel must inspect the construction site to confirm that there are no safety hazards from some structures that have been demolished or from some that have not been yet.
9. Listen to weather forecasts daily. Cease high-altitude demolition work when conditions such as strong winds of 6 levels or higher, heavy fog, thunderstorms, snow and ice, and other severe weather impact construction safety.

The company utilizes technologies such as "scaffold-free construction, uninterrupted production, and high-altitude suspended operations" to provide you with:

(1) High-altitude Construction Projects: New brick chimneys (up to 65m), concrete chimney slipforming (up to 240m), chimney design drawings, foundation pouring, turnkey projects, and more comprehensive services. New construction of kilns, tunnels, chimneys, grain silos, and cement storage tanks, as well as chimney heightening projects.

(2) High-altitude Demolition Projects: Various chimney demolition (including manual, directional, and [***] demolition), tower demolition (such as urea granulation tower, TV tower, iron frame), high-altitude concrete frame removal, and other challenging high-altitude demolition projects.

(3) Chimney Maintenance Services: Chimney renovation, chimney cleaning, chimney inspection, chimney flaw detection, chimney crack repair, chimney reinforcing with hoops, chimney carbon fiber reinforcement, chimney removal and heightening, chimney alignment, chimney lining replacement, chimney top repair, lightning protection system maintenance or replacement, chimney painting, kiln repair, tunnel kiln repair, insufficient chimney draft, etc.

(4) High-altitude Installation Projects: Chimney lightning rods, beacon lights, signal lights installation, steel chimney installation, chimney climbing ladders, safety platforms, safety guardrails, installation of ladders on chimney tops, and various tower installations. Factory and workshop glass installations.

(Five) High-altitude Anticorrosion Projects: Chimney painting with color rings, chimney lettering, cooling chimney anticorrosion, steel structure anticorrosion, sewage pool glass fiber anticorrosion, furnace frame anticorrosion, pipeline insulation and anticorrosion, wind turbine tower anticorrosion (cleaning, lettering, maintenance), various iron tower anticorrosion, chimney anticorrosion (platforms, ladders, safety nets), oil storage tank anticorrosion, crane anticorrosion, hotel and skyscraper exterior painting, crane anticorrosion, etc.

Safety Responsibility: In the event that we are contracted for labor services in this project, the safety measures for the construction will be prepared and implemented by us. Any safety issues or liabilities arising during the construction process will be solely our responsibility, and have no relation to Party A.

Company Commitment: "Guarantee quality, emphasize credibility, ensure safety, and honor contracts." For any unit constructed by our company, we will conduct regular follow-ups or phone calls within the quality assurance period to inquire about the quality of the work; if there are quality issues within the quality assurance period, we will provide free inspections and repairs!

Company Features: Easy and quick on-site construction, flexible contracting methods for projects of any size, available for both turnkey and single-package options. We go to great lengths to carefully calculate costs, keeping expenses within reasonable limits, and reinvesting saved funds into production. Welcome new and returning customers to inquire and collaborate!