Operation and Commissioning Process of the Solubilized Air Flotation Machine [Huamai Environmental Protection]_News Center Co., Ltd._Shandong Huamai Environmental Protection Equipment Engineering Co., Ltd._Zhongshang 114 Industry Resources Network 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Shandong Huamai Environmental Protection Equipment Engineering Co., Ltd.
Shandong Huamai Environmental Protection Equipment Engineering Co., Ltd.

Slaughterhouse Wastewater Treatment Equipment, Complete W...

24-hour Service Hotline
15092295556
Current Location:Home>News Center Co., Ltd.>Operation and Commissioning Process of the Solubilized Air Flotation Machine [Huamai Environmental Protection]

    Operation and Commissioning Process of the Solubilized Air Flotation Machine [Huamai Environmental Protection]

    2025-06-03

    Step One

    Thoroughly clean all equipment and pipelines, ensuring no foreign objects are left behind. Check for loose connections and lubricate moving parts as necessary.

    Step Two

    Inspect power circuits, operate under no-load conditions for a short period, determine if the pump and compressor rotate correctly, check for any noises or overheating. After injecting clear water, verify the correct operation of the mixer. Check the float scum collector, observe the direction of rotation, look for collisions and instability, or remove them promptly. 

    Step Three

    Power on the dissolved air flotation machine, adjust to the required concentration, stir until the solution concentration is uniform, and initially set the dosage to 50ppm. The amine liquid is initially set for a 1ppm addition (adjust the metering additive pump to the corresponding scale, confirm with specific tests). 

    Step Four

    Based on the initial raw water treatment volume, the PAC dosing amount is set at 50ppm, with an adjustable dosing pump scaled to the corresponding size. The polyacrylamide dosing amount is initially set at 1ppm, with an adjustable dosing pump scaled to the corresponding size. 

    Step Five

    Water Adjustment 

    (1) Close the air flotation machine's drain valve, sludge pipe valve, water valve (two valves lead to the original clear water pond), and the feed inlet valve.

    2) All other valves must be opened. 

    (3) Fill the main unit with tap water. 

    (4) Inspect the pond and associated pipelines for any leaks. 

    Power on the main unit, initiating its rotation. 

    (6) Open the air compressor, the pressure range for start and stop is 5-7 kg/cm². 

    (7) Turn on the solution air pump of the dissolved air flotation machine. 

    (8) Connect the gas source to the dissolution gas equipment and adjust the air intake of the flowmeter until the water in the pool turns milky white. 

    (9) Water levels in the pond can be supplemented with fresh water accordingly.




Contact us

Shandong Huamai Environmental Protection Equipment Engineering Co., Ltd.
Service Hotline 15092295556
Company Phone 15092295556
Company Address Shuangang Street, De Wang Sub-district, Zhucheng City, Weifang, Shandong Province, China, located 200 meters north from the intersection of Delisi Avenue and National Highway 206, on the east side of the road.

Message Consultation

 Click OK to indicate that you agree to《Service terms》《Privacy policy》

b2b.china9.net © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930

 Click OK to indicate that you agree to《Service terms》《Privacy policy》