PVC Pipe_SupplyPro Co., Ltd._Hebei Aimeikela Pipeline Technology Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Hebei Aimeikela Pipeline Technology Co., Ltd.

High-strength plastic alloy pipes, MPP, PP, PPR, PVC, PVC...

Consultation Hotline
15133202956  17332788158

News Center Co., Ltd.

Product Categories
PVC Pipe
品牌: Amy克拉
Business Model: Manufacturer Direct
Product Name: Polyethylene (PE) Water Pipe
Shipment Location: Hebei
单价: 1.00/Rice
最小起订Quantity: 100 Rice
供货总Quantity: 100000 Rice
有效期至: 长期有效
最后更新: 2023-10-23 14:29
 
详细Info

PE Water Supply Pipeline Installation Procedure

Hot melt socket installation, typically used for DN20-DN63mm specifications, with the following specific process:

1) Cut pipes with a pipe cutter as required for installation.

2) Mark the depth for insertion of the pipe.

3) Heat the melt head of the melting machine to approximately 20°C.

(4) Additionally, heat the pipes and fittings first, then the plug sockets (once the sockets are in place, let them sit for a while; do not twist during the heating and cooling of the sockets).

5) Natural cooling

6) Upon completion of construction and successful pressure testing, put into use.

2. This method is generally used for hot melt butt joint installations with specifications ranging from DN110 to DN1600mm. The specific operation process is as follows:

1) Place both待安装的PE pipes simultaneously in the heat welder's clamp (the clamp can be adjusted with clamping pads to fit the diameter of the pipes to be installed), with the other end of each pipe supported by a pipe bracket to the same level.

2) Utilize electric milling cutters to machine the cross-sections of the tubing, ensuring a perfect fit between the two tubes' mating surfaces.

3) Heat the electric heating plate to 210 degrees, place the ends of the two tubes in the center, and simultaneously operate the electro-hydraulic device to ensure complete contact between the ends of the tubes and the electric heating plate for heating.

4) Adjust the heating plate, then operate the hydraulic unit again to ensure the two molten tube ends are fully aligned, and securely lock the hydraulic unit (to prevent rebound).

5) Maintain a certain cooling time to release and complete the operation.

6) The facility may be reactivated after completion of construction and successful pressure testing.

(7) Take windproof measures when heating the pipes. Cooling should be done step by step; do not cool down rapidly.

3. Electric Fusion Joint (suitable for diameter DN 630mm)

1) The PE pipe is fully inserted into the electric fusion fitting.

2) The two wires of the electric melting machine are connected to the positive and negative terminals of the electric melting fittings, respectively.

3) Turn on the power, heat the heating wire, causing the iron in the internal contact to melt.

4) Cooling completed.

5) After completion of construction, the pipeline must pass pressure testing and acceptance before it can be sealed and put into use.


询价单
 Click submit means you agree to《Service terms》《Privacy policy》

17332788158