    Installation Requirements for Fireproof Windows

    2024-03-16

    Installation Requirements for Fireproof Windows

    Upon receiving the goods from Party A, carefully check the quantity, specifications, grades, and whether all accessories are qualified and complete in accordance with the supply contract.

    2. Fire-resistant windows should be stored vertically in a dry indoor space and anti-corrosion measures should be taken. The glass should be placed and leaned against objects that do not damage the edges or surfaces of the glass.

    3. Installation

    Before installing fire-resistant windows, they must be inspected. If the window frame or sash is warped, deformed, or the glass is broken due to improper transportation or storage, repairs must be made before installation.

    (2) During the installation of fire-resistant windows, it is essential to level them using a level or to correct their vertical alignment with string lines, ensuring they are perfectly horizontal, vertical, and at the same height.

    (3) Window frames must be integrated with the building, connected using wooden or iron components to the walls. After the steel window frames are installed, concrete mortar must be poured between the frame and the wall, and it must be cured for over 24 hours before normal use.

    (4) The position of the mounting holes for hardware accessories should be accurate, ensuring they can be installed flat and securely, meeting the usage requirements.

    (5) During the installation of fire-resistant glass, ensure that the gaps around all four sides are even. After positioning, fill and level the gaps with fire-resistant cotton, and then seal the edges with edge strips.

    (6) In addition to the aforementioned requirements, the installation should be carried out in accordance with the specifications of the "Engineering Construction and Acceptance Code."




Contact us

Ningbo Tongshi Electric Door Co., Ltd.
Service Hotline 15988678488
Company Phone 15988678488
Company Address No. 42, Xingning Road, Xingning Community, Yinzhou District, Ningbo City

Message Consultation

 Click OK to indicate that you agree to《Service terms》《Privacy policy》

b2b.china9.net © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930

 Click OK to indicate that you agree to《Service terms》《Privacy policy》