详情描述
Choose ShandongALCVapor-pressed aerated concrete wall panels, guaranteed to meet your satisfaction with installation.
ShandongALCAutoclaved aerated concrete wall panels can be used for building roofs as roof decks, eliminating the need for additional insulation materials. They achieve thermal insulation and energy-saving effects and can significantly shorten construction timelines due to their ease of installation.ALCAutoclaved aerated concrete panels are particularly suitable for large, complexly shaped steel structure roofs.ALCAutoclaved aerated concrete panels are widely used in residential buildings and other civil constructions.
I. Skills Preparation
1Engineering managers should carefully read the drawings and, based on the dimensions provided, lay out the perimeter lines of the partition walls and the positions and sizes of the door openings.;As the line is released, please conduct a review. Upon completion of the line release, the supervisor is to inspect. Upon approval, proceed with the construction.
2Develop a special construction plan for concrete wall panels, including the process, quality requirements, progress of construction, storage and transportation of documents, and submit it for review by supervisors.
3Ensure skill training for concrete wall panel installation personnel, and prepare a model room before large-scale installation. Only after inspection by all parties can large-scale construction proceed.
4During the installation of concrete wall panels, a dedicated person should supervise each process, promptly address any issues, and keep detailed records of the inspections.
5Prior to the installation of concrete wall panels, the concrete overhangs around the bathroom walls should be poured and finished to prevent any impact on the progress and quality of the installation due to insufficient concrete strength.
II. Document Preparation
1The concrete wall panel materials should be inspected by a designated person upon departure, accompanied by the relevant certification and inspection statements. Then, fill out the departure inspection record and have it signed and approved by the supervisor to ensure the material of the partition panels meets the current national and industry standards.
2The relevant auxiliary materials used should be compatible with the main materials.
3Concrete wall panels should be stacked on their sides, with wooden blocks placed beneath them, and adequate measures should be taken to prevent them from being淋雨.















