Material Windbreak Net at A Storage Yard, Windbreak Net A for Storage Yard, Application Range of Windbreak Net A for Storage Yard_SupplyPro Co., Ltd._Anping Ningchuan Wire Mesh Products Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Anping Ningchuan Wire Mesh Products Co., Ltd.

Windproof and dust suppression netting, windbreak dust suppression wall, guar...

Consultation Hotline
13623181996

News Center Co., Ltd.

Product Categories
Home > SupplyPro Co., Ltd. > Material Windbreak Net at A Storage Yard, Windbreak Net A for Storage Yard, Application Range of Windbreak Net A for Storage Yard
Material Windbreak Net at A Storage Yard, Windbreak Net A for Storage Yard, Application Range of Windbreak Net A for Storage Yard
品牌: Ningchuan
Product Features: Dustproof
Material: Galvanized Steel Sheet
Color: Blue, Green, Yellow, White, etc.
单价: 14.00/Rice
最小起订Quantity: 10 Rice
供货总Quantity: 19887 Rice
有效期至: 长期有效
最后更新: 2022-12-14 15:49
 
详细Info

Windproof Netting at Material Yard A, Tungliu Material Yard A, Windproof Netting Application Range
Introduction to the Main Performance of Windbreak and Dust Suppression Mesh
1. Windproof and dust suppression net with UV resistance (aging resistance) has a surface treated with spray painting, which absorbs ultraviolet light from sunlight, slowing down the oxidation rate of the material itself, thereby enhancing the product's anti-aging properties and extending its service life.
2. Flame retardancy: Due to the metal plate, it has excellent flame retardancy, meeting all fire safety and safety production requirements.
料场防风网A屯留料场防风网A料场防风网应用范围
3. Impact-resistant products capable of withstanding hail (strong winds) impact. The impact intensity test was conducted by dropping a 1kg steel ball from a height of 1.5 meters above the middle of the sample, resulting in no cracks or penetrative holes in the product.

Significantly reduces construction costs, enhancing the competitiveness of construction companies in the market.
料场防风网A屯留料场防风网A料场防风网应用范围
Manufacturing can be done according to the provided drawings.
Also, the conduit can be kept inside the furnace, eliminating the need for removal. Slag and iron extraction: Whether the secondary iron flows smoothly after the furnace is opened is the focus of the entire operation. Therefore, before iron extraction, adequate preparations should be made for difficult opening of the iron mouth, low or high flow rates, and iron mouth freezing. The time for secondary iron extraction depends on the iron capacity of the furnace, generally around half of the normal permitted capacity. It usually takes more than 20 hours. The deeper the slag layer, the later the secondary iron extraction. For blast furnaces with slag outlets, slag should be added first. During medium repair and furnace opening, due to the abundance of condensed slag and iron in the furnace, and less iron capacity, the secondary iron extraction should be done earlier, usually around 16 hours after ignition. Moreover, slag is often not added initially; it is placed after the iron mouth has produced three normal iron extractions.

询价单
 Click submit means you agree to《Service terms》《Privacy policy》

13623181996