Product Specifications:
| I. Main Configuration | ||||
| 1 | Controller: | Mitsubishi M70A Controller | ||
| 2 | Three-axis travel: | 800×500×550(mm) | ||
| 3 | Work Surface: | 500×1050(mm) | ||
| 4 | Spindle Specifications: | BT40 / 8000 rpm Taiwan Luo Li Spindle (Belt Drive) | ||
| 5 | Fast transit speed: | X﹨Y: 16 m/min Z: 12 m/min | ||
| Standard Configuration | ||||
| 1 | Centralized automatic lubrication system | 6 | Pneumatic Pull-Down Tooling | |
| 2 | Work Completion Warning Light | 7 | Network Transmission Function | |
| 3 | Electronic Handwheel | 8 | Toolbox and instruction manual | |
| 4 | Cooling System | |||
| 5 | Work Light Lighting | |||
Technical Specifications:
| Model | TXC-850 | |
| X-axis travel | 800㎜ | |
| Y-axis travel | 500㎜ | |
| Z-axis travel | 550㎜ | |
| Distance from spindle center to column guide rail | 550 ㎜ | |
| Spindle nose to worktable distance | 105-655㎜ | |
| Workstation | ||
| Workbench area | 500×1050 ㎜ | |
| Load Capacity | 600 kg | |
| T-slot width/quantity | 5-18×90 ㎜ | |
| Main shaft | ||
| Spindle Taper | BT40 | |
| Spindle Speed | Belt Drive 8000 rpm (standard) | |
| Motor | ||
| Spindle Power | 7.5kw | |
| Three-axis motor power | X/Y/Z:3 kw | |
| Feed Rate | ||
| Cutting Speed | 1-8000 mm/min | |
| Three-axis rapid movement speed | X/Y : 16 mm/min Z :12 mm/min | |
| Positioning Accuracy (mm) | ±0.004/300 | |
| Repeatability accuracy (mm) | ±0.003 | |
| Other Specifications | ||
| Mechanical weight | 5000 kg | |
| Section 3: Standard Accessories Details | ||
| Serial Number | Standard Configuration | Origin |
| 1 | Mitsubishi M70A Controller | Mitsubishi of Japan |
| 2 | Display Unit | Mitsubishi of Japan |
| 3 | Three-axis motor | Mitsubishi of Japan |
| 4 | Spindle Motor | Mitsubishi of Japan |
| 5 | BT40-8000 rpm Spindle | Taiwanese Luo Li |
| 6 | C3 precision ball screw | Taiwan Syntec/Sintec |
| 7 | Three-axis telescopic inner guard | Shanghai Zhenfei |
| 8 | Centralized automatic lubrication system | River Valley / Proton |
| 9 | Angular ball bearing import | Japan NSK |
| 10 | Axial coupling | Germany/Japan |
| 11 | Wire material | Shanghai Zehong |
| 12 | Operation Panel Unit | Shanghai Zhehong |
| 13 | Handwheel | Shanghai Zhehong |
| 14 | LED work lighting fixture | Shanghai Zhehong |
| 15 | Relay board | Shanghai Zehong |
| 16 | Three-color alarm light | Shanghai Zhehong |
| 17 | Circuit Breaker | France (Schneider) |
| 18 | Contactor | France (Schneider) |
| 19 | Cutting Cooling Motor | Changzhou Nok |
| 20 | Electrical cabinet heat exchanger | Ruike |
| 21 | Cat5 Cable | |
| 22 | Knockout cylinder | |
| 23 | Blowing System | |
| 24 | Toolbox | |
| 25 | 1"1" inch screwdriver | |
| 26 | Hexagon socket wrench | |
| 27 | Locking knife holder one | |
| 28 | Set of blades (including a set of sprocket, Latin, and wrench) | |
| 29 | Pressure plate set | |
| 30 | 6" Flat-Nose Pliers Set | |
| 31 | Large Cross Screwdriver | |
| 32 | Programming Manual | |
| 33 | Operation Manual | |
| 34 | Leveling Adjustment Pads | |
| 35 | Inspection Report | |
Technical Service Requirements:
4.1 Installation and Commissioning: The Seller is responsible for free installation, adjustment of the equipment, and on-site free training for the operation and maintenance personnel at the Buyer's location.
4.2 Technical Support: The Seller provides effective technical support and can adjust machine tool parameters based on the product characteristics required by the Buyer.
4.3 Warranty Period: The machine tool comes with a 12-month free warranty after acceptance, during which free parts and services are provided, ensuring timely and effective service.
4.4 Service Time Commitment: The seller promises that the after-sales service personnel will arrive on-site to handle the machine tool repair within 24 hours of receiving the repair report.
4.5 Post-warranty technical support: Within 2 years after the warranty expires, the seller provides free software technical consulting services. In case of failure in the machine tool's mechanical or system parts, the seller offers free software technical consulting services.
4.6 Post-warranty parts supply: After the warranty period expires, the seller shall continue to provide the buyer with cost-effective replacement parts for a long time, with the repair parts offered to the buyer at the seller's procurement cost price.
Machine Tool Acceptance:
5.1 Acceptance Standards: Conducted according to technical requirements and parameters.
5.2 Acceptance Procedure:
5.2.1 Upon completion of debugging at the seller's factory, the buyer may conduct a preliminary acceptance inspection. Check the geometric and positioning accuracy and process standard test pieces to achieve processing accuracy and range. A signed approval by both parties is required before shipment.
5.2.2 Inspection results are to be considered final upon final acceptance.
Factory Documents:
| Serial Number | Document Name | Quantity |
| 1 | Machine Accessories List | 1 |
| 2 | Manufacturing Quality Inspection Sheet | 1 |
After-sales Service:
1. One-year warranty for product quality issues from the date of goods delivery.
2. If used by the customer, any non-natural damage caused by improper use or modification is not covered under the above warranty, and the customer must bear the repair costs.






