How Scaffold Net Shortens Construction Project Duration?_News Center Co., Ltd._Anping Ye Kaiwei Wire Mesh Products Co., Ltd._Zhongshang 114 Industry Resources Network
Anping Ye Kaiwei Wire Mesh Products Co., Ltd.
Anping Ye Kaiwei Wire Mesh Products Co., Ltd.

Screen Printing Products Manufacturing and Sales

24-hour Service Hotline
15032164555
0318-80697888
Current Location:Home>News Center Co., Ltd.>How Scaffold Net Shortens Construction Project Duration?

    How Scaffold Net Shortens Construction Project Duration?

    2018-01-26

     Many buildingsLadder NetManufacturers are continuously improving pricing and after-sales services, resulting in greater discounts for customers. Different types of products serve various purposes, and the construction climbing net, as the name suggests, is ideally suited for construction applications. It is a product that can significantly enhance benefits in the construction sector, offering great convenience. Additionally, it provides excellent assistance for construction work, making it a valuable asset to the construction industry, bringing substantial convenience.

    Building climbing mesh is an excellent auxiliary product for construction, offering great utility. Due to the unique nature of the construction industry, it is crucial to pay attention to the quality of the product to avoid unnecessary troubles during the construction process.

    How Scaffold Net Works to Efficiently Shorten Construction Time? It also brings a significant improvement in safety over traditional scaffolding, allowing for enclosed construction and effectively preventing injuries caused by human or object falls. It can effectively prevent fires caused by welding sparks, shorten construction time, avoid repeated assembly, and independently elevate to the designated position in half an hour, without occupying vertical transportation equipment.

    Once the entire scaffolding is elevated, immediately securely fasten the load-bearing rods and brackets to the pre-buried components of the building or through-wall rods. Simultaneously, use steel pipe couplings to reinforce the outer scaffolding with the internal supports of the building, and move the guide pieces up one level and securely fasten them in place.

    Following the temporary connection of the elevated structure, the construction of scaffolding, the laying of intermediate layers or temporary scaffold boards, and the installation of the third horizontal beam, the lifting seat and the upper floor wall guide seat are installed to connect the main frame columns. The scaffolding is set up to the designed height, the top scaffold boards are laid, the toe boards are installed, the lower safety net and scaffold boards are laid, and the upper part of the scaffold is effectively connected to the structure (with a connection spacing not exceeding 6 meters). The outer dense mesh safety net is hung to the top of the scaffold, and the fall arrest hook is inserted into the base fall arrest device.

    The verticality of the climbing frame uprights should be controlled within 1/400, the horizontal height difference between each side of the frame crossbars should be less than 50mm, and the straightness deviation in the extension direction of the outer frame should not exceed 20m. Wall penetration holes should be pre-drilled according to the overall climbing frame design plan and elevation positions. The horizontal distance error of the holes should be controlled within 4mm. The installation distance error of the inner uprights from the wall should not exceed 20mm. Components requiring processing, including wall penetration bolts, I-beams, angle irons, and steel plates, all use common hot-rolled steel. The key to processing is the welding quality. All welds are full welds with a thickness of 6mm or more. After welding, the welds are checked with a weld angle gauge, and any non-compliant areas are re-welded. During the installation of the outer frame, temporary measures are taken as the installation height increases to securely connect the outer frame to the building. Stable guidance devices are installed between the outer frame and the building, and the distance between each guide component is kept consistent.

    Purchasing climbing mesh.Ladder MeshChoose Xuanan as your climbing net manufacturer, and you get a one-stop service from production to installation. Official Website:http://lvyekai426.zhongshang114.com



Contact us

Anping Ye Kaiwei Wire Mesh Products Co., Ltd.
Service Hotline 15032164555
Company Phone 0318-80697888
Company Address Shenzhou City, Tangfeng Town, Datan Village, North of the Village

Message Consultation

 Click OK to indicate that you agree to《Service terms》《Privacy policy》

b2b.china9.net © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930

 Click OK to indicate that you agree to《Service terms》《Privacy policy》