How is the scaffolding mesh installed during construction?_News Center Co., Ltd._Anping Ye Kaiwei Wire Mesh Products Co., Ltd._Zhongshang 114 Industry Resources Network
Anping Ye Kaiwei Wire Mesh Products Co., Ltd.
Anping Ye Kaiwei Wire Mesh Products Co., Ltd.

Screen Printing Products Manufacturing and Sales

24-hour Service Hotline
15032164555
0318-80697888
Current Location:Home>News Center Co., Ltd.>How is the scaffolding mesh installed during construction?

    How is the scaffolding mesh installed during construction?

    2018-01-26

     Utilize the Great Firewall window assembly

    Bar 1 is securely fastened to the wall inside the lower window, tied to the internal horizontal mesh of the climbing frame. Bar 2 is placed within the wall of the next window and fastened to the diagonal bars of the climbing frame. Bar 3 is positioned inside the wall and tied to Bar 2. Assembly complete.Ladder NetThe spacing between the slats should not exceed 4 meters.

    2. Application of steel cantilever brackets for climbing mesh installation

    Walls without windows can be installed using steel suspension brackets.Climbing Frame MeshWe are currently preparing the wall by leaving a hole, removing the sales sheet, and using a mandrel to loosen it. The lock plate features 14 holes for hanging the climbing frame mesh. The steel suspension rod is made of Ф12 reinforcing bar, approximately 1.56 meters shorter, with a curved hook at the top. The back of the curved hook is焊接 with a hook for attaching the climbing frame mesh. At the bottom, it is焊接 with a swivel hinge for the telescoping pole and is positioned against the wall to secure the base, close to the top curved hook.

    It can climb or descend along buildings. This is a new scaffolding system developed in recent years, primarily used for high-rise shear wall residential projects. This system completely revolutionizes scaffolding techniques: first, it eliminates the need to flip the scaffolding; secondly, it does away with the need for manual labor. The Thin Chang Spray Painted Climbing Mesh, also known as the lifting frame, can be categorized into several main types based on its power source, such as hydraulic, electric, and manual foot-pushed.

    The first floor spans a wide distance with climbing mesh, which can be supported by diagonal bamboo posts, or a single-side mesh setup can be employed.

    3. First Floor Large Span Crawler Mesh

    The hooks are designed with a welded plate and a loop made of nylon rope, ensuring that the wall plate is secured to prevent detachment upon the application of force on the hanger. The spacing between hangers is typically 3 to 4 meters.

    The dismantling and assembly process (used once assembled and throughout the construction) is not limited by the height of the building, greatly saving labor and materials. Moreover, it offers significant improvements over traditional scaffolding from a safety perspective. It boasts a significant growth advantage in high-rise construction. The mesh itself undergoes a spray painting process for surface treatment, significantly enhancing its service life and making it suitable for use in outdoor conditions.

    Choose Anteng Ladder Net Factory for your climbing net and ladder net panel needs. From production to installation, we offer one-stop service. Official website: http://lvyekai426.zhongshang114.com



Contact us

Anping Ye Kaiwei Wire Mesh Products Co., Ltd.
Service Hotline 15032164555
Company Phone 0318-80697888
Company Address Shenzhou City, Tangfeng Town, Datan Village, North of the Village

Message Consultation

 Click OK to indicate that you agree to《Service terms》《Privacy policy》

b2b.china9.net © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930

 Click OK to indicate that you agree to《Service terms》《Privacy policy》