- AllProduct Category
-
Miscellaneous Products
Shielding Cabinet
Shielded Server Room
Shielded Room


详情描述
Filter installation sequence
(a) Pre-drill holes at the filter installation location in the shielding room.
(b) Run the waveguide connector through the hole into the interior, then securely fasten the nut to the shielding wall (copper mesh or steel plate) indoors.
(c) The outdoor power input is connected to the filter's wiring. The indoor power is then connected via the waveguide connector. When wiring, the red wire corresponds to the phase wire, and the yellow wire corresponds to the neutral wire.
Grounding Device:Draw a 10 sqmm grounding wire from the shielding room housing and connect it to the equipotential grounding rod.
6 Indoor Electrical Equipment:Distribution boxes, LED lighting lamps, and multi-functional outlets must be strictly selected from renowned brands that comply with national standards to ensure stable operation of the shielding room and minimize malfunctions. The routing of electrical cables and the arrangement of switches and outlets indoors are tailored to the customer's requirements.
Interior Decoration:Ceiling: Micro-perforated aluminum panel + Floor: Color steel plate + Gypsum board + Anti-static floor + Skeleton














