Road金刚 Pattern & Marking_Product Introduction Co., Ltd._Road金刚 Patterns & Marking, Supply, Construction Equipment Mesh_Chongqing Dongwu Road Engineering Co., Ltd._Zhongshang 114 Industry Resources Network
Chongqing Dongwu Road Engineering Co., Ltd.

A new high-tech enterprise focusing on the research, development, production, sales, and construction of road coating technologies.

全国服务咨询热线
13251300005  13808362121


Road金刚 Pattern & Marking

价      格Negotiable

最小起订0 Piece库存0 Piece

发货时限
3 Days发货
Location
Chongqing
有效期至
长期有效
最后更新
2022-09-29 09:56
View Count
75

Business Card

  • Your company's名称Chongqing Dongwu Road Engineering Co., Ltd.
  • 联 系 人吴海东 (先生)
  • Your company'sPhone13251300005
  • Mobile号码13808362121
  • Company AddressChongqing Nanshan District, 28-15 Huoxin Constellation

买家正在看

  • Epoxy Non-slip Layer C Component

    Negotiable

  • Road金刚, Main Coating

    Negotiable

  • Road金刚 Pattern & Marking

    Negotiable

  • Epoxy anti-slip layer Component B

    Negotiable

Product Details
Category:
Road金刚
Features:
Vivid colors, easy installation
Applicable to:
Various scenic greenways, bike paths, etc.

Product Features:

Vivid colors,Easy to installWater-based, environmentally friendly, wear-resistant and non-slip, outdoor aging-resistant, and ultra-long service life.

 

Application Range:

Various landscape greenways, bicycle paths, fitness trails, pedestrian streets, skybridges, parks and squares, village communities, a variety of corporate and institutional units, airports, train stations, docks, parking lots, and helicopter pads; construction is possible on surfaces such as asphalt, concrete, steel plates, stone, ceramics, wood, and glass.

 

Usage Instructions:

Each road marking material set consists of three components (A, B, C) and pigment paste. Simply pour the well-mixed B, C components and an appropriate amount of pigment paste into the A component, stirring until the mixture is uniformly fine and free of coarse particles.

② The construction is carried out by spraying or brushing, in two coats. Each coat should not be applied too thickly; the next coat can only be applied after the previous one has dried.

③ Unused materials, after adding a small amount of water and sealing the bucket, can be stored in a cool place for use within 30 days. Stir well before use; it does not affect the coating performance.

④ Temperature below 5°C and humidity above 80% prohibit construction during rain, snow, or strong wind conditions. Transportation and Storage: All components of the product are water-based, do not contain volatile solvents with 1 toxic substances, and are not flammable or explosive. They can be transported and stored according to standard product procedures. Under normal temperature and sealed conditions, without packaging leakage or contamination, the product has a shelf life of 2 years.


询价单
主题 *
内容 *
Your company's名
Contact person *
ContactPhone *
电子Email
验证码  
 点击确定代表您同意《服务条款》《隐私政策》
 
 Click submit means you agree to《Service terms》《Privacy policy》

Phone Consultation

Consultation Phone:
13251300005