产品Price 2.00/square meter
最小起订Quantity:100 square meter 供货总Quantity: 3600 square meter
Height |
|
Color |
Two-color |
Material |
PP (Polypropylene) |
BJXPP15 Sports Field Artificial Turf Height: 15mm Line Spacing: 3/16 inch Material: PP Density: 63,000 clusters/sq. ft. Adhesive Backing: Styrene-Butadiene Rubber (SBR) Bottom fabric: Mesh bottom fabric Years: 5 years Width: 4 meters Transportation: Logistics Distribution This product is a dual-color flexible wire, designed for senior's doorball court. Made of abrasion-resistant and anti-aging polypropylene, the grass-like fibers are wider and thicker, offering exceptional durability.Service Life No less than 6 yearsThe grass yarns are woven using a tufted technique, with a non-directional design that enhances the smooth movement of the ball in the gate, ensuring uniform friction. Artificial Turf Gate Ball Court Dimensions: The playing area is generally 20 meters by 15 meters, or 20 meters by 25 meters, with a surrounding auxiliary area of at least 1 meter. Region, surrounded by well-built ball-stop walls.A 20m x 15m site, the finished size is generally not less than 22m x 17m. Preparation before bonding artificial putting green turf: 1. The bottom surface of the turf, non-woven fabric, seam fabric, etc., must be cleaned thoroughly and be dry with no moisture present. 2. It is recommended to conduct construction at an environmental temperature above 5°C; it is not advisable to work during rain or plum rain, as this may lead to excessively long adhesive curing times. Causes non-stick phenomenon. The specific construction process for putting green artificial turf: 1. Gluing: The surface should be brushed with an even and consistent layer of adhesive. Repeated application is prohibited, as it may lead to bubbling and even falling off. Base fabric Apply glue, strictly control the glue thickness, and ensure the application speed is moderate. Apply the glue separately to the two bonding surfaces to be adhered. 2. Adhesion: Depending on the actual influence of the current temperature, humidity, and atmospheric pressure, reasonably control the drying time. Generally, it is 10-30 minutes after the adhesive is applied. Within minutes, the adhesive should be about 80-90% dry, ideally not sticky to the touch. During bonding, it is essential to align and secure the pieces in one attempt. Do not move the bonded parts back and forth after the adhesive has been applied. The object being handled. 3. Pressure Application: After bonding, remove any surface debris, and use a rubber mallet to firmly tap from the bonding area towards both sides, ensuring the surface is fully sealed. Tighter density, stronger bonding. 4. Curing: The curing time is typically three days, and the strength testing is usually ten days. Therefore, close attention must be paid to maintenance during the curing period. Avoid excessive exposure to sunlight, water immersion, and movement to achieve the adhesive state. 5. Clean the fragments of turf cut from the site before applying quartz sand and rubber granules.


Phone Consultation
QQ Service