35kV接地变兼站用变小电阻成套装置,选用干式接地变DKSC-500/37-200/0.4,37±2×2.5%/0.4kV, ZN,yn11 6.5%,电阻器212Ω,100A/10s,电阻电流互感器100/1A 5P20/5P20/0.5, 10/10/10VA ,含干式变压器智能温度检测及控制器、温湿度控制器、加热器、电磁锁,所有内部连接母排和线缆等。严格按照设备组装标准进行操作,保证设备水平度和垂直度。


|
Home > Construction Case Studies Co., Ltd. > 石柱县打风坳和都会村分散式风电项目电力安装工程