
Ningxia Shizuishan City power generation company's ash storage facility project, covering an area of 200,000 square meters. During operation, leakage detection of the already filled areas was conducted using the high-density resistivity method, with 1,500 electrodes deployed. A suspected leakage area of 150 square meters was identified, which was later repaired and re-measured, passing the inspection.





























