
Shanxi Province Datong City coal mine pit power generation enterprise ash storage project, covering an area of 61,000 square meters. The thickness of the buried coal ash is 7 meters. Currently, an integrity test of the anti-seepage system in the buried area is being conducted. On-site testing utilizes the high-density resistivity method, with normal potential inversion data indicating that the anti-seepage system is in good condition.





























