
The Geermu Industrial Waste Dumping Site Project in Qinghai Province covers an area of 280,000 square meters. The project employs a two-bag-one-film impermeable system. During operation, integrity inspections of the impermeable membrane are conducted on-site using the high-density resistivity method. Data analysis from the collected samples did not reveal any abnormalities in the impermeable system.





























