Contracted Demolition and RecyclingSmall and Medium EnterprisesTypical chemical factoryRefinery, cement factory, fertilizer plant, food additive factory, brewery, electronics factory.Food factory, small-scale manufacturing plantWait a moment.Fully qualified, with first-class demolition qualifications, the company is responsible for liaising with various departments of the local government in the project area, prioritizing the client's time and effort savings.Upon the commencement of the dismantling work, the contractor must assign a dedicated person to inspect and supervise the progress of the project. On one hand, thorough records must be maintained. On the other hand, if any unstable conditions are detected, the work must be halted immediately, and proactive measures must be taken to eliminate potential hazards.

We have accumulated extensive experience in dismantling processes, ensuring the intact protection of communication lines, power lines, and underground pipelines..Specializes in contracting complex structures and high-difficulty buildings.Various chimney (brick, concrete) removal, water tower removal, removal of various high-rise concrete structures, iron chimneys, ground-level towers, rooftop towers, single-pole towers, and television towers, etc.Chemical storage facility dismantling, chemical machinery and equipment removal.Disassemble old machine tools, refrigeration equipment, air conditioning systems, production assembly lines, motors, cables, and wires, etc.Our company boasts extensive experience in factory dismantling construction contracts and is equipped with complete machinery and equipment. We are capable of undertaking factory dismantling projects for structures of various spans and designs..Corporate obsolete assets, factory sales, various inventory overstocks, and淘汰 goods.

During construction, ensure that work is segmented and vertical intersections are avoided. Additionally, pay attention to the details of the construction. For instance, when removing beams, ensure the descent is effectively controlled. When removing columns, first chisel out the rebar along the bottom of the column and use a manual chain hoist for directional pulling. Also, use gas welding to cut the rebar on three sides of the column to retain the rebar on the front side of the pulling direction. For pipes, containers, and other items that require removal, identify the type and chemical properties of the residue, then take appropriate measures before proceeding with the construction.
































