As the process of modernization advances, environmental issues are becoming increasingly prominent. The company has always prioritized environmental protection efforts, continuously exploring and seeking the most optimal demolition solutions. We have introduced the industry's most advanced dust control equipment for construction, collaborated with the Environmental Protection Bureau to adopt green and environmentally friendly dust cover agents, and purchased noise-reducing materials such as soundproof screens. We have also gradually established systems, strengthened management, and improved the system. In 2013, we successfully passed the ISO 14001:1996 International Environmental Management System certification.
Demolition equipment must be supervised by a designated person and strictly adhere to the one-machine-one-person system. Horizontal cross-demolition methods are prohibited. For structures that require toppling demolition, the distance between the toppling material and adjacent buildings or structures must be at least 1.5 times the height of the demolition object. For buildings undergoing partial demolition, the retained sections must be reinforced first before proceeding with the separation and demolition.
We are a unit with specialized qualifications, and we have handled the relevant procedures through the county or district-level safety supervision department! Chemical factories are divided into equipment and building demolition. When undertaking demolition projects, only enterprises with relevant qualifications can handle them based on the nature of the project. Practitioners, engineering and technical management personnel, and economic management personnel must have the corresponding training and certificates issued upon qualification. Valid certificates should be verifiable by the construction administrative authority.
Establish a technical management system with the technical person in charge as the core at the beginning of the demolition project. According to the project characteristics and construction specifications, formulate safe, reasonable, and economic technical plans to guide construction. Enter the site to promptly identify and resolve issues on-site. Focus on formulating construction technical measures for special sections, difficulties, key points, and focal areas during construction. All construction organization designs must be reviewed and approved by the company's chief engineer and project chief engineer before reporting to the construction unit and supervisory unit for approval. Subsequently, supplement and perfect the construction organization design based on the approval opinions.