Climbing net leader:
1. Save data: Only set up 4-5 times the height of the floor, significantly reducing the use of scaffolding; 2. Labor saving: No need to transport materials, fully automated lifting and lowering; 3. Strong independence: relying on its own equipment for lifting and not occupying straight transportation equipment; 4. Shorten the construction period: prevent duplicate construction and achieve semi automatic improvement; 5. Adequate protection: The height of the new climbing frame is suitable for the construction scale of formwork binding reinforcement and formwork removal support; 6. Safe and reliable: low assembly, low removal, complete anti tilt and anti fall equipment, and lifting operation inside the frame; 7. Management standards: With a high degree of equipment standardization, it can be managed according to the equipment, following the fixed rules of the support position, and easy to view; 8. Professional operation: including mechanical, electrical, and lifting equipment, operators must undergo professional training; 9. Full applicability: Complete the construction of three-dimensional projects from bottom to top, and complete the exterior wall decoration project from top to bottom; 10. Civilized construction: targeted planning, professional construction, and standardized management.































