Product Specifications
Origin:Guangdong, Dongguan Material:Normal concrete Appearance:Single-row round holes Brand:Other Shape:Block-shaped Model:DN800*2500 Density:C30 Thermal Conductivity:Good Compressive Strength:C30 Sound Absorption Coefficient:Good Grade:Qualified Application Position:Auxiliary bricks

Product Features
Dongguan Pre-cast Inspection Chambers Wholesale, Manufacturer Supplies, Suppliers, Wholesale Prices [Dongguan Songshulin Environmental Protection Building Materials Co., Ltd.] Pre-cast Inspection Chamber Functions: (1) Quick construction, on-site installation is fast, taking only 30 minutes. Particularly suitable for sites with significant impact on road traffic and short construction time requirements. (2) Simple installation, no need for on-site casting of the base plate; after leveling with sand and gravel, it can be hoisted. The process is simple and highly mechanized, with fast construction progress. Low skill requirements for technical workers, simple construction and installation methods eliminate randomness in the construction process, ensuring quality of the inspection chamber. (3) Good sealing, made by molds, precise dimensions of components, smooth inner and outer walls, easy to assemble, and good airtightness, not prone to leakage. (4) Durable with high strength and quality, long service life of 50 years. (5) High standardization of pre-cast inspection chambers, with standardized design and production of chamber components, facilitating factory production. Compared to cast-in-place inspection chambers, it saves construction time, significantly improves construction quality, and greatly reduces construction costs. (6) Strong adaptability, well-suited for poor geological conditions, abundant groundwater, deep burial, and other adverse construction conditions. Pre-cast chambers adapt well to on-site construction environments, greatly reducing the need for auxiliary measures (such as pumping, support, etc.). (7) Convenient connection, when pre-cast inspection chambers require maintenance or pipeline connection, only 1-2 sections of components need to be replaced. The replaced components can also be used for other inspection chambers, or预留孔洞 for pipe diameters and elevations as per design, allowing quick connection of pipes when needed, reducing waste and saving costs.
Product Real Shots




































