Gold Mining Equipment List for 200-300 tons per hour raw ore processing capacity
6mm and below processing capacity: 80-100 T/H
Recycling Rate: 90%+ for fine gold and single crystal gold
【Gold Mining EquipmentProcess Overview
Raw materials are delivered to the vibrating hopper by engineering vehicles, then evenly fed into the upper conveyor belt by the bottom vibrating feeder. Subsequently, they enter a multi-joint knife washing sieve for sorting into two specifications: coarse and fine materials. The coarse materials are discharged into a fixed gold panning mat chute for final collection, while the waste materials are drained into a waste pool.
Fine material is fed into a hopper and then pumped into a 1200# horizontal automatic ore centrifuge for separation using a 4-inch sand pump. The refined material is automatically transferred to a concentrate bin, while waste material is discharged into a waste pool.