Raw ore processing capacity: 200-300 tons, less than 6mm processing capacity: 80-100 tons
Gold Mining Equipment Package Process Overview
Raw materials are transported into the feeding chute by engineering vehicles, then flushed into a multi-screw washing drum sieve for sorting into two specifications: coarse and fine materials. After the coarse materials are collected at the end through a fixed gold pan chute, the waste materials are discharged into the waste material pool.
Fine material is discharged into the hopper and then pumped into a desliming machine using a sand pump for desliming. After desliming, the slurry is pumped back into the hopper and further into a 1200# horizontal fully automatic ore centrifuge for concentration. The concentrated material is automatically discharged, while the waste material is automatically pumped into the waste pool.
【200-300 tons full set gold mining equipment technical specifications】
Name | Specs | Quantity | Power | Unit Price | Total Amount | Note |
Infeed Chute | 3500*5500, Material: 10mm thick steel plate | 1 set | - | |||
Screw Sieve | Multiple-joint auger washing drum sieve | 1 set | 7.5 | Belt Feeder with Support Bracket | ||
Sludge Dewatering Equipment | 2000*3800 | 1 set | 4.4 | Polyurethane Abrasion-Resistant Screening Mesh | ||
Centrifuge | 1200# Horizontal Automatic Ore Discharging Machine | 1 set | 21.5 | PLC Computer Automatic Control | ||
Material Box & Sand Pump | 4-inch Sand Pump, 11KW | 2 sets | 22 | |||
Centrifugal Pump | 1 unit | 5.5 | ||||
Submersible pump | 5.5KW | 2 units | 11 | |||
Distribution Box | Inclusive of motor wires for the equipment, excluding cable wires. | 1 set | - | |||
Total Power | 71.9KW | |||||
Factory Price | 200-300 tons processing capacity all-inclusive gold panning equipment, price available upon inquiry | |||||
Generator Set
Name | Specification | Quantity | Power | Unit Price | Total Amount | Note |
Generator set | 150KW Yuchai | 1 unit | - | 85000 | 85000 | |
Factory Price | 200-300 ton processing capacity complete gold mining equipment, please call for price | |||||
【Parts Selection List within Half Year】
Name | Specs | Quantity | Unit Price | Total Price | Note | |
Sand pump pipeline | 15 meters | |||||
Centrifugal Pump Pipe | 30 meters | |||||
Submersible pump piping | 60 meters | |||||
Jade grass supply | 16 meters | |||||
Screw Conveyor Screen Mesh | Mesh aperture: 6mm | 6 sets | ||||
Sifter roller chain | 1 set | |||||
Diverting valve | 6 | |||||
V-belt | Complete Set | 3 sets | ||||
4-inch sand pump | Blade impeller | 1 piece | ||||
Pump Housing | 1 piece | |||||
Gasket | 5 | |||||
Swivel Connector | Centrifuge | 2 pieces | ||||
Pneumatic solenoid valve | 1 set | |||||
Air line | 1 disk | |||||
Airline Connector | 1 box | |||||
Generator Set | Triple Filter | 2 sets | ||||
Pipe Clamp | 30 units | |||||
Cable wire | 502 | 70 meters | ||||
Centrifugal Pump 5.5 kW | 1 unit | |||||
Submersible pump | 1 unit | |||||
Total Price | 200-300 tons processing capacity complete gold mining equipment, price available upon inquiry | |||||
【Equipment Compatibility Selection List】
Name | Specs | Power | Quantity | Unit Price | Total Price | Note |
Mercury Mixture Machine | 800*1200 | 3 | 1 unit | |||
Steel ball | 0.3 tons | |||||
Gold Separating Shaking Table | 1.1 | 1 unit | ||||
Vapor Mercury Apparatus | - | 1 unit | Free gift | |||
Mercury Paste Separator | - | 1 unit | ||||
Melting Furnace | 380V 1-4KG | 5 | 1 unit | Internal components are imported from German Siemens | ||
Crucible | 2KG | - | 10 sets | |||
crucible | 4KG | - | 10 sets | |||
Gold Bar Molds | 100g - 5 pieces | - | 22 | |||
Melting Furnace Pump | 1 unit | 10-meter hose included | ||||
Total | 200-300 ton processing capacity complete gold mining equipment, price upon call | |||||