1. The new external suspension system requires no wall penetration installation, thus avoiding damage to the concrete beam and slab structure, and preventing water seepage and leakage.
2. W-beam material consumption reduced; average usage is 1.5 meters, lowering procurement costs.
3. All materials except for plastic pre-buried components are reusable.
Usage Instructions:
After the floor concrete pouring is completed, wait for 18 hours after the floor concrete pouring (adjustable according to the temperature), install the I-beam with steel plate on one side at the pre-buried pipe location of the floor, pass M20#10.9 grade high-strength bolts through the holes in the I-beam steel plate and the pre-buried steel sleeve, add an 80mm×80mm×8mm steel plate on the back with flat washers, spring washers, and tighten the nuts.
On the upper level of the cantilevered layer, at the corresponding positions of the outer wall, outer beam, and I-beam, pre-bury a steel sleeve (the same as the pre-buried method for I-beam sleeve). After the concrete pour for the upper level is completed, begin installing the steel tie rod, which is divided into two sections. One with a rectangular steel plate is installed on the upper level's edge beam, and one with a rounded steel plate is installed on the I-beam hanger plate. All connection points are connected with M20#10.9 grade high-strength bolts; then, tighten the turnbuckle bolts to form a triangular load-bearing system.
How to use the new suspended scaffold?
1. Determine the placement of plastic embedded parts and installation bolts.
2. Remove the installation bolts and O-rings after demolding, and install double-end high-tensile bolts.
3. I-beams are positioned and secured with nuts.
4. Erect steel pipe scaffolding.
5. Same method for pre埋 installation of bolts when forming upper beam and plate.
6. After demolding, assemble the telescopic handle and adjust to the proper length before securing with a pin.
What services can be provided by purchasing the new suspended platform?
1. A professional team offers you free technical guidance
2. Multiple professional exterior frame engineers provide free technical guidance throughout the process.
3. Available for steel layout drawings and calculation books
4. On-site installation guidance by professional technical personnel