Handan Xiongba Fastener Manufacturing Co., Ltd.VIP

紧固件制造
Enter Shop

Overhanging beam

平台认证
  • Unit Price

    Negotiable

  • Brand

    Dominant Fasteners

  • MOQ

Contact
Leave Msg

Platform Service

Supplier Verified



邯郸市雄霸紧固件制造有限公司

VIP   采商通第2年
资料通过中商114认证
Recommend

Product Details

Specs

Gallery

  • Brand:

    Dominant Fasteners

  • Unit Price:

    Negotiable

  • MOQ:

  • Total:

    0

  • Address:

    HebeiHandan

  • Delivery:

    0Hours

  • View More

Description

1. The new external suspension system requires no wall penetration installation, thus preventing damage to concrete beam and slab structures and ensuring no water leakage.

2. W-beam material consumption reduced; average usage of 1.5 meters is sufficient to lower procurement costs.

3. Materials other than plastic prefabricated parts are reusable.

Usage Instructions:

After the floor concrete pouring is completed, wait for 18 hours after the floor concrete pouring (adjustable according to the temperature), install the I-beam with steel plate on one side at the pre-buried pipe location of the floor, insert M20#10.9 grade high-strength bolts through the holes in the I-beam steel plate and the pre-buried steel sleeve, add a 80mm×80mm×8mm steel plate on the back with flat washers, spring washers, and nuts tightened.

On the upper layer's outer wall, outer beam, and corresponding position to the I-beam, pre-bury a steel sleeve (the pre-burying method is the same as the I-beam sleeve). After the concrete pouring of the upper layer is completed, begin to install the steel tie rod, which is divided into two sections. One with a rectangular steel plate is installed on the upper floor's edge beam, and one with a round head steel plate is installed on the I-beam hanger plate. All connection points are connected with M20#10.9 grade high-strength bolts; then, tighten the turnbuckle bolts to form a triangular force system.

How to use the new suspended scaffold?

1. Determine the placement of plastic embeds and installation bolts.

2. Remove the installation bolts and gaskets after demolding and install double-ended high-strength bolts.

3. Place the I-beam in position and secure it with nuts.

4. Erect steel pipe scaffolding.

5. The same method is used to pre-bury and install bolts during the formwork support of upper beam plates.

6. After demolding, assemble the rod and adjust to the proper length, then secure with a pivot pin.

What services can be provided by purchasing the new suspended scaffold?

1. A professional team offers you free technical guidance

2. Multiple professional external frame engineers provide free technical guidance throughout the process

3. Available steel beam layout drawings, calculation sheets

4. On-site installation guidance by professional technical personnel


Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price Negotiable
Inquiry None
Delivery HebeiHandan
Brand Dominant Fasteners
Available for Sale National
Custom Processing Is
Origin Hebei
Expiry Long Valid
Update 2024-11-06 10:40
Gallery

Handan Xiongba Fastener Manufacturing Co., Ltd.Published byOverhanging beamGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top