Handan Xiongbao Fastener Manufacturing Co., Ltd.VIP

紧固件制造
Enter Shop

Overhanging beam

平台认证
  • Unit Price

    Negotiable

  • Brand

    Dominant Fasteners

  • MOQ

Contact
Leave Msg

Platform Service

Supplier Verified



邯郸市雄霸紧固件制造有限公司

VIP   采商通第2年
资料通过中商114认证
Recommend

Product Details

Specs

Gallery

  • Brand:

    Dominant Fasteners

  • Unit Price:

    Negotiable

  • MOQ:

  • Total:

    0

  • Address:

    HebeiHandan

  • Delivery:

    0Hours

  • View More

Description

1. The new external suspension system requires no wall penetration installation, thus preventing damage to concrete beam and slab structures and ensuring no water leakage.

2. Reduces H-beam material consumption, with an average requirement of 1.5 meters, thereby reducing procurement costs.

3. Materials, excluding plastic pre-buried parts, are reusable.

Usage Instructions:

After the floor concrete pouring is completed, wait for 18 hours post-pouring (adjustable based on temperature), install the I-beam with the steel plate side at the pre-buried pipe location on the floor. Pass M20#10.9 grade high-strength bolts through the holes in the I-beam steel plate and the pre-buried steel sleeve, add a 80mm×80mm×8mm steel plate on the back with a flat washer, spring washer, and tighten the nut.

On the upper level of the cantilevered floor, at the corresponding positions of the outer wall, outer beam, and I-beam, pre-bury a steel sleeve (the same as the I-beam sleeve). After the concrete pouring of the upper level is completed, begin to install the steel tie rod, which is divided into two sections. One with a rectangular steel plate is installed on the upper floor edge beam, and the other with a round head steel plate is installed on the I-beam hanger plate. All connection points are connected with M20#10.9 grade high-strength bolts; then, tighten the turnbuckle bolts to form a triangular force system.

How to use the new cantilever scaffold?

1. Identify the location for plastic embedment components and installation bolts.

2. Remove the installation bolts and gaskets after demolding, and install double-ended high-strength bolts.

3. Place the I-beam in position and secure it with nuts.

4. Erect steel pipe scaffolding.

5. The same method is used to pre-bury and install bolts during the formwork support for upper beam plates.

6. After demolding, assemble the telescopic rod and adjust to the appropriate length, then secure it with a pivot pin.

What services can be provided by purchasing the new suspended scaffold?

1. A professional team offers you free technical guidance

2. Multiple professional external frame engineers provide free technical guidance throughout the process

3. Available steel section layout drawings and calculation sheets

4. On-site installation guidance by professional technical personnel


Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price Negotiable
Inquiry None
Delivery HebeiHandan
Brand Dominant Fasteners
Eligible for Sale Areas National
Custom Processing & Tailoring Is
Origin Hebei
Expiry Long Valid
Update 2024-11-06 10:41
Gallery

Handan Xiongbao Fastener Manufacturing Co., Ltd.Published byOverhanging beamGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top