






Fuji Film Apeos 2450S Error Code 44
016-766 SMTP Server File System Error - Refer to BSD: - Describes an error on the SMTP server. Reason/Action: Press [OK] or [Close] button, or recover after the time set in Fault Timeout. Confirm with the SMTP server administrator. Confirm SMTP server error. Handled on host side. 016-767 Invalid Recipient Email Address - Refer to BSD: - Describes an incorrect recipient email address. Reason/Action: Press [OK] or [Close] button, or recover after the time set in Fault Timeout. Verify the email address and resend. Handled on host side. 016-768 Invalid Sender Address (Login Error) - Refer to BSD: - Describes an incorrect sender email address. Reason/Action: Press [OK] or [Close] button, or recover after the time set in Fault Timeout. Verify the email address and resend.

Fuji Film Apeos 2450S Product Specifications 6
In the event of an accident during maintenance operations, it not only leads to injuries to the maintenance personnel and damage to equipment, but may also harm the client's trust. Therefore, to prevent accidents, it is essential to strictly adhere to the warnings and precautions in the operation. Do not perform dangerous tasks. 1. Ensure the space required for safe operation. If the work area may cause damage to the client or their materials, prior negotiation with the client is necessary. After ensuring the safety of the working environment through operations such as relocation, proceed with the task. Additionally, when the work area is extremely narrow, do not force the operation. First negotiate with the client to ensure the required space, and then proceed with the task. 2. Power Supply: To prevent electric shocks and injuries, maintenance operations must be carried out after the power is turned off and the power plug is removed. However, when it is unavoidable to turn on the power for tasks such as voltage measurement, exercise caution to prevent electric shocks. 3. Drive Parts: Inspections, cleaning, and oiling of the drive parts such as belts, sprocket teeth, and gears cannot be done while the equipment is running. 4. Heavy Objects: When lifting objects weighing 15.8 kg or more, two people must work together. In the case of single-person operation, the weight lifted from the ground to the chest must be less than 15.8 kg. Moreover, when disassembling/installing heavier parts, pay attention to the posture to avoid back pain. 5. Safety Devices: Ensure that the safety devices preventing equipment accidents (fuses, circuit breakers, interlock switches) and the safety devices for client operation (control panels, covers, etc.) all function satisfactorily. Furthermore, it is prohibited to modify any equipment that may impair safety functions. 6. Installation and Removal of Parts: When handling large parts that are difficult to grip, note the following: If there is no designated holding area on the part, hold it with a stable posture. Do not grasp the weaker parts of the structure (e.g., covers). For parts like shock absorbers that can be opened, secure them with knots or similar before disassembly. The edges of parts and covers may be sharp. Do not touch them. If hands or fingers are oily, wipe them clean before starting work. Also, when pulling out parts or cables, do not pull too hard and pull them out slowly. 7. Lithium Batteries (Lithium Metal Batteries)

010-397 (01h) Heat Roll STS DiscoConnection Fail Refer to BSD: CH10.3 for explanation. It indicates that the AD value was detected as open circuit for the Thermistor of the Fusing Unit consecutively 3 times. Comment 010-397 includes a sub-code, Code: 0000000Xh (X = alphanumeric character), which is displayed along with the fail message. Different actions should be taken based on the code. Make sure to check the sub-code (0Xh) and take appropriate action. Confirm the operation? Turn off the power, confirm the copier printer lease, and check if the Fusing Unit is installed correctly. Check the drawer connection between the Fusing Unit and the main unit.nnetor (DP600/DJ600) for pin bending, foreign matter mixed in, burn damage, etc.? Check if the connector J414 on the Drive PWB is properly connected. Steps: Turn off the power, then remove the Fusing Unit. Note: Install or remove the Fusing Unit only after the power is turned off. Measure the resistance between the DJ600S-7 Pin and DJ600S-8 Pin of the Fusing Unit. Is the resistance high? Y/N Check for breaks, shorts, or poor contact in the following wires: From Fusing Unit DP600S-7 to Drive PWB J414-11. From Fusing Unit DP600S-8 to Drive PWB J414-10. If no issues are found, replace the Drive PWB. (PL 18.2) Replace the Fusing Unit. (PL 7.1) After replacing the Fusing Unit, enter CE mode and execute Initialize under Printer Diag > Parameter > Life > Fusing Unit Print Count and Fusing Unit Time Count to initialize the maintenance counter.

Copier Rental - Gem to Perfection is the General Agent - Nanan District Copier Rental is provided by Chongqing Gem to Perfection Technology Co., Ltd. Chongqing Gem to Perfection Technology Co., Ltd. has been a witness to the manufacturing equipment of electronic and electrical products in Chongqing, Chongqing City. Over the years, the company has implemented the policy of scientific management, innovative development, and honesty, meeting customer needs. The leaders of Gem to Perfection and all staff warmly welcome inquiries and negotiations from all walks of life, to create an even better future for Gem to Perfection.




































