Safety Precautions for Shelf Tubing Use
1. Regularly remove accumulated materials such as bricks, concrete blocks, and debris from the dangerous parts of the scaffolding tubes; and there should be restrictions on the materials stacked on the scaffolding tubes to prevent overloading.
2. Regularly inspect the overall or partial structure of the shelf tube for any deviations, particularly focusing on whether there are any loosening or misalignment at the connections of the shelf tube. If any anomalies are found, they should be repaired and reinforced promptly.
3. Inspect the rope securing the root of the dense mesh for looseness, as well as the bamboo matting and the binding points for any signs of broken strands. If any breaks or looseness are found, they should be replaced promptly.
![]()































