Construction process
Construction conditions: Accurate layout → Surface roughening, rebars adjustment → Reinforcement fabrication and installation → Formwork installation → Concrete pouring → Demolding → Curing
Quality Control
1. Prior to each installation, clean and apply a release agent evenly.
2. The reinforcement welding and binding of pedestrian barriers must comply with design and specification requirements, particularly ensuring the accuracy of the internal reinforcement placement.
3. After installing the template, inspect the sides and top surface, ensuring both are straight and aligned.