Zhaoqing Floor Paint Construction Manual
1、 Construction preparation
1. Site inspection: Before construction, it is necessary to inspect the site to ensure that it is flat, free of water leakage, seepage and other issues, so as not to affect the construction effect.
2. Material preparation: Prepare materials, including floor paint, coating materials, tools and equipment, to ensure smooth construction.
3. Processing the foundation layer: Before construction, it is necessary to treat the original foundation layer by scraping off old paint, polishing, filling cracks, etc., and ensure that the foundation layer is dry, free of oil stains and dust.
4. Construction environment: During the construction period, it is necessary to maintain a dry, windless, and dust-free environment to ensure the normal progress of the construction.
2、 Construction technology
1. Primer application: Primer is mainly applied once to the ground to improve adhesion and uniformity of the coating. Generally, two coats are required.
2. Mid coat painting: Mid coat painting refers to painting the ground after the primer has dried to increase the thickness and glossiness of the coating. Generally, two coats are required.
3. Topcoat application: Topcoat application is a crucial step in the entire construction process. Topcoat generally needs to be applied three times to improve the wear resistance, corrosion resistance, and decorative properties of the ground.
4. Curing: After the floor paint is applied, it needs to be cured indoors for 24 hours or outdoors for 48 hours to ensure the quality and durability of the floor.
5. Quality inspection: After construction is completed, a quality inspection is required. Check the flatness of the ground, the density and texture of the coating to ensure that the construction quality meets the design requirements.
3、 Construction precautions
1. Pay attention to environmental hygiene: During the construction period, it is necessary to pay attention to the hygiene of the construction environment, maintain cleanliness and dryness to ensure construction quality.
2. Paint storage: Paint should be stored in a cool and dry place, avoiding direct sunlight and moisture that can affect the quality of the paint.
3. Avoid cross contamination: During construction, it is necessary to prevent cross contamination of different types of coatings to avoid affecting the construction effect.
4. Protecting the construction area: During the construction period, it is necessary to protect the items around the construction area to prevent paint contamination and damage.
5. Construction personnel need to wear protective equipment to avoid causing harm to the human body.
The above is a detailed instruction manual for the construction of floor paint in Zhaoqing. We hope it can be helpful to the construction personnel