Technical Specifications
Principle of Measurement: Spectroscopic Absorption Method
Measurement Range: 0.100 cm
0...500cm
0...1000 cm (other scales available for customization)
Resolution: 0.01 cm
Temperature Measurement Range: 0.0...60.0℃
Medium Flow Rate >0.02 m/s
Shell Material: Stainless Steel
Pipe Thread NPT 3/4 or M39 x 1.5
Signal Wire Length: 5m (Customizable)
Accuracy
Calibration Method
Protection Grade
0...3bar
Pressure Range Rs485 (MODBUS RTU)

2. Instructions for Use
2.1 Please carefully read the instructions before use.
2.2 This description applies to the Raymond Smart Series electrodes.
2.3 Sensor membrane heads are consumables; once damaged, they cannot be repaired.
2.4 Before opening the packaging, please inspect for any damage. If the outer packaging is damaged, do not proceed to open the package. Please contact the sales company, the authorized agent of the brand, or contact us directly immediately. After the carrier's representative arrives, open the packaging together to inspect for any damage to the electrodes and take photos as evidence.
2.5 If the outer packaging is intact but the electrodes are damaged, please contact the sales company, the authorized agent of the brand, or contact us directly, and return the electrodes in their original packaging.
2.6 Remove the protective sleeve gently before using the electrode.
2.7 During the measurement process, if there is dirt, adhesive material, or scale at the electrode membrane head, it can cause inaccurate or fluctuating measurement values. It should be cleaned and calibrated promptly.
2.8 The content described in this manual may change with the continuous improvement of the product. Our company will not provide separate notification in the manual and shall not be liable for any consequences arising therefrom.
2.9 This product requires regular replacement of the nozzle membrane.
3. Electrode wiring
3.1 Please connect the product according to the instructions carefully; incorrect wiring will result in complete product damage.
3.2 Absolutely no power supply before all cable connections are completed. For safety reasons, please thoroughly inspect all system wiring before supplying power and confirm that everything is completely correct.
Supply electricity.
—5. Green SHIELD lines over 30m in length require screen crossing


































