Colorful anti-slip road construction technology
Colorful anti-slip road surface is mainly achieved by laying on the road surface2-3mm thick adhesive layer, with high-strength aggregate, synthesized and calcined at high temperatures, spread over the adhesive. After the adhesive has fully cured, excess aggregate is removed to form a colored warning anti-slip layer. This road surface is vividly colored, suitable for scenic roads, pedestrian overpasses, anti-slip on hazardous sections, lane guidance, etc. It offers strong anti-slip performance and durability, and the surface can be customized for different situations by selecting aggregates of different sizes and colors: 2-3mm for pedestrian walkways, 3-5mm for motor vehicle lanes.
Adhesive MaterialA/B fraction ceramic particles
Road Closure Materials: Warning Lights, Warning Barricades, Reflective Safety Signs, Cones1 batch, lighting points
Construction Equipment: Mixers, Grinders, Hair Dryers, Construction Vehicles
Construction Tools: Adhesive Spatulas, Roller Brushes, Shovels, Wheelbarrows, Small Shovels, Brooms
Construction Auxiliary Materials: Edge Sealing Tape, Gloves, Masks, Blades, Rulers
Method Steps:
Prior to construction, clear debris from the asphalt surface and perform a thorough cleaning and sanding to ensure there's no mud or other adherents, no oil stains. Construction can only proceed once the surface is clean and dry.
2. Define the construction area and use a vacuum cleaner to clean the dust from the road surface again before beginning work.
3. Cover the required road markings (such as lane lines) with tape to ensure they are not obscured.
4 Prepare construction materials, tools, and other auxiliary construction materials according to the construction requirements.
5. To provideMix Adhesives A and B in the specified ratio and stir thoroughly.
6.Apply the mixed adhesive evenly over the construction section, and then use a toothed rubber broom to evenly spread the adhesive on the construction surface, ensuring the adhesive is uniformly thick, covers the entire construction section, and has no leakage points. The application time for the adhesive should be between 5 minutes to 15 minutes; it should not be too long to avoid the adhesive losing its bonding properties due to curing.Construction Activity
7. Sprinkle the required clean colored anti-slip aggregates evenly over the adhesive until fully covered, ensuring the aggregates are well-combined with the adhesive and the surface is compact and level. Be careful not to press too hard.Leakage.
8.Remove the adhesive tape promptly to ensure the road edge is not damaged. In case of any damage, promptly repair it using the original materials.
9.After the adhesive has cured, use a broom or a strong vacuum cleaner to remove excess aggregates. Pay attention to remove any aggregates that are not securely bonded. Do not contaminate the road surface during sweeping. Traffic can be reopened once all excess aggregates have been cleared.