How should we properly maintain this type of board? Timely maintenance can greatly extend the lifespan of the board.
Boards and various accessories shall be placed in the rainproof shed according to different specifications upon arrival. No heavy objects shall be placed on the surface.
During the installation of the skeleton, a designated person should be responsible for hoisting the suspended basket. When on the floor, temporarily secure it to prevent collision with the skeleton. When installing the exterior wall panels, add foam heads to the end of the suspended basket's steel pipes, then lower the basket onto the unprotected floor and close it, to prevent impact with the insulation board.
After the thermal insulation facade is installed, a designated person should check the distance from the facade to the ground to prevent personnel from approaching.
At each stage near the curtain wall, temporary protection of the insulation board should be implemented before construction, which can be achieved by using fiberboard to shield. Even after the construction is completed, some temporary protective measures are required to achieve the intended later use effects.
Handle materials with care during transportation to prevent damage and scratches.
Its decorative effect is very attractive. The outer decorative surface can be processed into various colors according to customer requirements, achieving effects similar to aluminum-plastic panels, wood, marble, and other decorative materials; it is insensitive to wind and rain erosion and air pollution, and has good self-cleaning capabilities. Generally, dust pollution can be easily cleaned with water, looking as new as before.