Tianjin Deng Songlin Environmental Protection Technology Co., Ltd.VIP

市政工程潜水,抽粪,清理化粪池,清理隔油池,清理污水池,管道堵水,管道清淤检测
Enter Shop

Clear septic tanks

平台认证
  • Unit Price

    $100.00/ton

  • Brand

    Pine Forest Pipeline Cleaning

  • MOQ

    1ton

Contact
Leave Msg

Platform Service

Supplier Verified



天津邓松林环保科技有限公司

VIP   数字营销第4年
资料通过中商114认证

Product Details

Specs

Gallery

  • Brand:

    Pine Forest Pipeline Cleaning

  • Unit Price:

    $100.00 / ton

  • MOQ:

    MOQ1ton

  • Total:

    2222ton

  • Address:

    Tianjin

  • Delivery:

    3days

  • View More

Description

To ensure that the stream dredging work does not impact the surrounding environment, thorough cleaning and maintenance should be conducted during the process. Man-made waste and other debris must be completely removed, with a designated person in charge. Several laborers are assigned to each construction section to protect the existing facilities of the stream, lay straw mats on the mud-scooped areas, and only allow trucks to proceed after their wheels and bodies have been cleaned to maintain the cleanliness of the scenic area. ??III. Safety Measures ??Barriers and warning signs are set up at major traffic exits, with designated personnel on duty to organize traffic flow. Adequate lighting and safety red lights are provided in the construction sections, and safety education is conducted for drivers, emphasizing adherence to traffic safety regulations and a strict ban on driving under the influence of alcohol.

All septic tank lids are made of reinforced concrete, with a thickness of 5cm. The lids of the tanks must have openings for the toilet bowl and the outlet for fecal sludge. The lid of the second tank should also have an opening for easy removal of sludge and clearing of the fecal pipe. The lid of the third tank should have an outlet for fecal matter, facilitating its discharge. Each opening must have a pre-fabricated small cover. When installing the large lid, seal it with cement sand mortar, ensure the lid is tightly closed to prevent rainwater from entering, and guarantee the tank is sealed for fermentation. Installation of the fecal pipe and toilet bowl: Insert a feeding pipe with a diameter of 10cm and a length of 30-50cm into the opening of the tank lid, secure it to the lid, and fit the squat (sitting) toilet bowl over the feeding pipe, securing the toilet bowl and making a slight seal.

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $100.00 / ton
Sales None
Delivery Tianjin3dayswithin
Stock 2222tonMOQ1ton
Brand Pine Forest Pipeline Cleaning
Region Tianjin
Performance Sewage Extraction
Auxiliary Manual dredging
Expiry Long Valid
Update 2022-12-02 14:53
Gallery

Tianjin Deng Songlin Environmental Protection Technology Co., Ltd.Published byClear septic tanksGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top