











Pre-fabricated modules enhance the traditional electrical system layout, adhering to the principles of energy, material, water, and space conservation. They aim to lighten the building structure and utilize on-site rapid assembly techniques to transform the sequential construction process, thereby shortening the construction period.
Establish a six-standard system including general design for substation, detailed drawings for component manufacturing, production process in the factory, on-site assembly process, building cost quota, and prefabricated construction control.































