Guizhou Lushu Construction Engineering Co., LtdVIP

Enter Shop

Acrylic stadium material

平台认证
  • Unit Price

    $59.00/square meter

  • Brand

    Green Comfort

  • MOQ

    100square meter

Platform Service

Supplier Verified



Guizhou Lushu Construction Engineering Co., Ltd

游客未注册
资料未认证
保证金未缴纳
该发布人未在本站注册,信息真实性无法保证,请谨慎选择,建议优先选择VIP会员
Category
  • No Category
Recommend

Product Details

Specs

Gallery

  • Brand:

    Green Comfort

  • Unit Price:

    $59.00 / square meter

  • MOQ:

    MOQ100square meter

  • Total:

    200000square meter

  • Address:

    GuizhouZunyi

  • Delivery:

    3days

  • View More

Description

 Introduction to the properties of acrylic materials:
① Highly competitive cost performance ratio (superior performance plus affordable price, now it is also a flagship product in the market); ② Made from high-quality acrylic latex raw materials, it is colorful, bright in color, and has some UV resistance, so it can maintain its color even under long-term exposure to sunlight; ③ Water based raw materials, non-toxic, environmentally friendly products; ④ High weather resistance, not suitable for aging, long service life;
⑤ Good sun resistance, deep coloring, and long-lasting color retention;
⑥ Has abrasion resistance, anti slip properties, and is not prone to powdering; ⑦ Strong adhesion, high peel strength, not easily delaminated, good appearance, and not prone to foaming; ⑧ Smooth surface, easy to clean, strong durability, convenient daily maintenance, and low cost.
 3. Construction plan for acrylic material
1、 Construction conditions:
Temperature: Ground temperature shall not be lower than 5 ℃ and not higher than 45 ℃;
Humidity: The relative humidity of the air should not exceed 85%;
Slope: not less than 3:1000, not greater than 5:1000;
Flatness: The height difference of a three meter ruler shall not exceed 3mm
3、 Its surface requirements:
Smooth (with a 3M ruler error of 3mm), sturdy and firm, without loose or floating objects, clean and tidy, and cut reasonable temperature joints.
4、 Process flow:
Surface treatment → Cutting V-shaped seams → Grinding or pickling → Filling seams → Filling accumulated water → Applying and scraping elastic layer → Applying and scraping reinforcement layer → Applying and scraping surface layer in two stages → Marking → Cleaning and completion.
5、 Construction procedure:
1. Water test: Check the flatness of the foundation. If it does not meet the requirements, the foundation contractor should repair it according to the requirements of the stadium construction contractor.    
A、 After testing the water on the court floor, mark the location of the accumulated water with a white chalk circle;    
B、 Mix the intermediate coating and specialized sand/cement thoroughly to repair the area;    
C、 After completion, use a ruler to measure the area and control the error within 3mm;    
D、 After the entire site is repaired, water should be drained for inspection. If the depth of the accumulated water does not exceed 3mm, it is considered qualified and the next step of construction can be carried out.  
  2. Construction primer:
A、 Primer A: Mix the B material in a ratio of 1:1 with water of 5-8 and mix evenly. Apply it evenly to the ground by rolling/scraping along the pitch;    
B、 The general drying time is 6 hours. After it dries completely, inspect the site and remove any rough or protruding sand particles;    
C、 Water discharge inspection, if the location of accumulated water is found, the treatment method is the same as (1).
9. Complete and clear the site.
4、 Quality assurance and after-sales service:
(1) The engineering warranty period is one year, with lifelong maintenance.
(2) If the damage is not caused by human factors during the warranty period, Party B shall provide free warranty (including labor and materials). If it is caused by human factors during use, Party B shall charge Party A for the material costs.
(3) During the warranty period, Party B shall conduct on-site inspection within one working day from the date of receiving written repair notice from Party A. If it is indeed the responsibility of Party B, Party B shall arrive at the site on time for repair after negotiating with Party A to determine the repair time.

龙翔画册1-11

Disclaimer:Info provided by user, user liable for authenticity, accuracy & legality. Zhongshang114 assumes no liability.

Tip:Confirm supplier qualification & quality before purchase to avoid risks.

Unit Price $59.00 / square meter
Inquiry None
Delivery GuizhouZunyi3dayswithin
Stock 200000square meterMOQ100square meter
Brand Green Comfort
brand Green Comfort
Place of Origin Zunyi, Guizhou
Specifications routine
Expiry Long Valid
Update 2020-09-17 17:35
Gallery

Guizhou Lushu Construction Engineering Co., LtdPublished byAcrylic stadium materialGallery Lib

Contact Merchant



Join

Successful Enterprise Join, Enjoy Multiple Privileges

Join Hotline:4006299930

Please scan with mobile phone

Customer Service

Service Hotline:4006299930

Official Account

WeChat Official Account, Get Business Opportunities

Scan to follow WeChat

Top