Material Preparation for PVDF Pipe Welding Process?_News Center Co., Ltd._Zhenjiang Shendong Electrical Fittings Co., Ltd.

Zhenjiang Shendong Electrical Fittings Co., Ltd.

We specialize in a comprehensive range of products includ...

TEL : 0511-88395398   13905285398

Website Home
Company Introduction
Product Center Co., Ltd.
News Center Co., Ltd.
Honor Qualification Co., Ltd.
Company Showcase
Contact Information
Material Preparation for PVDF Pipe Welding Process?
Publish Time:2024-01-16        View Count:35        Return to List

When transporting and storing PVDF piping, manufacturers must adhere to the following guidelines during the piping fabrication process:

To maintain a clean workshop, PVDF piping should be organized and整顿 according to projects and dimensions.

Do not drag PVDF pipes on the ground. (This may cause contamination due to material damage or packaging damage.)

3. When loading PVDF pipe ends, the loading height must not exceed 1 meter (due to the potential damage to materials below from excessive load).

4. Materials should be stored indoors to avoid exposure to the outdoors, and in a low humidity environment. (Wetness can occur inside the pipe head when there are significant changes in temperature and humidity.)

5. When storing outdoors, the PVDF pipes must be moved to the workshop interior prior to welding operations to maintain consistent temperatures with the indoor environment. (PVDF pipes: Welding operations should be conducted after storage in the workshop for over 2 hours.)


>

b2b.china9.net © Zhongshang 114 Hebei Network Technology Co., Ltd.Address: Room 6009, Oriental New World Center, No.118 East Zhongshan Road, Qiaoxi District, Shijiazhuang City, Hebei ProvincePlatform Service Hotline: 4006299930

 Click submit means you agree to《Service terms》《Privacy policy》


电话咨询

咨询电话:
0511-88395398