Factory Load-Bearing Capacity Inspection_SupplyPro Co., Ltd._Shenzhen Housing Construction Engineering Inspection Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Shenzhen Housing Construction Engineering Inspection Co., Ltd.

Building Safety Inspection & Certification, Structural Inspection & Certifica...

Consultation Hotline
13590406205

News Center Co., Ltd.
  • No News

Product Categories
  • No Category
Home > SupplyPro Co., Ltd. > Factory Load-Bearing Capacity Inspection
Factory Load-Bearing Capacity Inspection
品牌: Shenzhen Construction Engineering Inspection
Safety and Quality Type: Reliability Testing
Available for sale locations: National
Service Content: Factory Load-Bearing Capacity Inspection
单价: 电议
最小起订Quantity:
供货总Quantity:
有效期至: 长期有效
最后更新: 2023-02-16 14:09
 
详细Info

Shenzhen Housing Construction Engineering Inspection Co., Ltd. is registered at No. 101, Building 3, 6283 Longgang Avenue (Henggang Section), Bao'an Community, Yuanshan Street, Longgang District, Shenzhen. The registration authority is Shenzhen Market Supervision Administration Bureau, and the legal representative is Li Yongjiang. The business scope includes general operational projects and permitted operational projects: house safety inspection and appraisal, building structure inspection and appraisal, steel structure inspection and appraisal, on-site main structure inspection, construction project quality and material inspection, indoor environmental inspection of buildings, and building energy-saving inspection.

The project is located in Dongguan City, and the building is an industrial factory. Production equipment is already in place on the second floor. To meet the expansion needs, it is proposed to add a production line, including 10 additional CNC milling machines, each weighing approximately 4.5 tons. To understand the load-bearing capacity of the building's second floor and ensure the safety of equipment placement, the client has entrusted our company to conduct a detection and assessment of the load-bearing capacity limit of the second floor and evaluate the feasibility of placing equipment on the floor.

Our company has conducted an inspection and evaluation of the building's main structure and found it to be of poor quality, not meeting the regulatory standards. After structural calculations, the design does not support the client's plan to add equipment. Through joint negotiations with the client, the client has arranged the production line on the first floor ground level, thereby avoiding the risk of cracking or collapse due to overloading of the floor structure, and has received the client's gratitude and recognition.


询价单
 Click submit means you agree to《Service terms》《Privacy policy》

13590406205