High-pressure and low-pressure seamless steel pipes for fluid transportation_SupplyPro Co., Ltd._Cangzhou Zhuole Pipeline Co., Ltd. 
在线客服 在线客服邀请中...
关闭

您好,现在客服正邀请与您通话,请留下您的联系方式,客服将尽快与您取得联系。

 点击提交代表您同意《服务条款》《隐私政策》
Cangzhou Zhuole Pipeline Co., Ltd.

Seamless steel pipes, straight seam steel pipes, spiral steel pipes, anti-cor...

Consultation Hotline
15612768662

News Center Co., Ltd.
  • No News

Product Categories
Home > SupplyPro Co., Ltd. > High-pressure and low-pressure seamless steel pipes for fluid transportation
High-pressure and low-pressure seamless steel pipes for fluid transportation
品牌: Tianjin DaWuYou, Neimenggu Baogang, Anyang LongTeng
89*4: 89mm x 12m
108*4: 108mm x 12m
133*4: 133mm x 12m
单价: 1000.00/ton
最小起订Quantity: 1 ton
供货总Quantity: 300 ton
有效期至: 长期有效
最后更新: 2022-12-05 16:18
 
详细Info

The production process of general seamless steel pipes can be divided into cold drawing and hot rolling. The production process of cold-rolled seamless steel pipes is generally more complex than that of hot-rolled pipes. The billet must first undergo three-roller continuous rolling, followed by sizing tests after extrusion. If there are no surface cracks, the round tube is then cut by a cutting machine into billets of approximately one meter in length. Next, the annealing process begins, where the billet is acid cleaned with acidic liquids. During the acid cleaning, attention must be paid to the presence of excessive bubbling, as this indicates that the quality of the steel pipe does not meet the required standards. Cold-rolled seamless steel pipes are generally shorter in appearance than hot-rolled seamless steel pipes, and their wall thickness is usually smaller than that of hot-rolled pipes. However, they appear brighter and have fewer roughness on the surface, and less burrs on the diameter. The delivery status of hot-rolled seamless steel pipes is typically after hot treatment. After quality inspection, the pipes are hand-picked by staff, then coated with oil on the surface, followed by multiple cold drawing tests. After hot rolling treatment, a piercing test is conducted; if the expansion is too large, it must be straightened. After straightening, the pipes are transported by conveyors to the flaw detection machine for testing, labeled, sorted by specifications, and then stored in the warehouse.

询价单
 Click submit means you agree to《Service terms》《Privacy policy》

15612768662